• The major dam of Hutiao Gorge Water-Power Station is first chop large scale earth and rockfill dam.

    虎跳峡水电站大坝工程一级大型石坝

    youdao

  • Major earth and rockfill dams must have "an emergency exit" (emergency spillway or emergency measures) in case super floods cause dam failures.

    重要石坝必须设“太平门”(非常溢洪道),以便遭遇非常洪水时采取非常溢洪措施

    youdao

  • This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.

    三峡茅坪溪防护石坝沥青混凝土骑缝碾压施工工艺国内首创的施工方法。

    youdao

  • Filling operations for drains of Ruoergai arctic-alpine wetland have such four types as damming with bag filling with earth and rock, earth and rockfill dam, concrete gravity dam and model dam.

    若尔盖高寒湿地排水沟壑堵分为土石筑坝石坝混凝土重力坝模板四种类型

    youdao

  • The theory and method of health diagnose for earth-rockfill dam are hot issues in the research domain of dam safety monitoring.

    本文结合石坝特点,应用力学数学理论展开石坝健康诊断理论与方法研究

    youdao

  • Combining the settlement characteristics of earth-rockfill dam, the model of genetic algorithms and genetic simulated annealing algorithms is established.

    结合石坝沉降规律,建立了土石坝沉降遗传算法遗传模拟退火算法模型

    youdao

  • In our country there are a great many large, medium and minitype reservoirs and DAMS have safety problems of different degree, especially do the earth-rockfill dam.

    我国相当部分小型水库大坝存在着不同程度安全问题,其中石坝绝对居多。

    youdao

  • The research status of hydraulic fracturing in core of earth-rockfill dam is briefly reviewed, and the mechanisms, the conditions and the influence factors of hydraulic fracturing are induced.

    简要评述了国内外关于土石坝心墙水力劈裂研究现状,归纳了土石坝心墙水力劈裂发生机理、发生条件影响因素等方面的研究成果。

    youdao

  • For deep and pervious soil foundation under earth-rockfill dam, a concrete diaphragm wall must be provided to control seepage.

    建造透水的覆盖层上的石坝,坝基常设混凝土防渗墙,如何正确地确定防渗墙的应力是坝工设计的难点。

    youdao

  • The analytic study on stability and high slope of tunnel rock mass has been carried out by Xi 'an University of Science and Technology for one-stage development of Daluishu earth-rockfill dam.

    西安理工大学一级开发柳树高土石坝洞群围岩稳定性高边坡进行分析研究

    youdao

  • In this paper, nonlinear stress-strain analysis for a high earth-rockfill dam and its foundation cutoff is given.

    本文土石坝基础防渗墙进行了非线性有限元分析

    youdao

  • The new dam consists of an earth core rockfill embankment and a concrete transition at the left abutment.

    新建包括座土质墙堆石堤坝个位于坝肩的混凝土过渡带

    youdao

  • Hydraulic fracturing in earth core rockfill dam is a key problem which is unsolved and is given an universal attention in engineering field.

    土质墙坝的水力劈裂问题一直是工程界普遍关注又亟待解决的关键问题。

    youdao

  • The compacted rate method is worked out for quality control of earth-rockfill dam and the data for calculating the compacted rate are acquired by GPS.

    研究了基于GPS的压控制法在碾压质量控制中的应用,利用GPS采集数据经过计算得到压实率,然后通过压实率来控制碾压质量。

    youdao

  • The compacted rate method is worked out for quality control of earth-rockfill dam and the data for calculating the compacted rate are acquired by GPS.

    研究了基于GPS的压控制法在碾压质量控制中的应用,利用GPS采集数据经过计算得到压实率,然后通过压实率来控制碾压质量。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定