A final estimate will be issued in February.
最终的估计将在二月公布。
New consultants must be particularly careful to review project plans before settling on a final estimate that is forwarded to the client.
在最终将测算提交给客户之前,顾问新手一定要多加小心去复审好这些项目。
Based on the practice, the bidding of the amount of work detailed list is discussed especially in compilation, bid, bid evaluation and final estimate.
结合实际。对工程量清单招投标实施过程中的清单编制、报价、评标、结算几个方面进行了论述。
The tally consists of actual sales for the four days since the film opened last Friday, and a Christmas day estimate. Final sales data will be issued on Wednesday.
这个数字包含从上周五电影公映用来的四天实际销售额以及对圣诞节这一天票房的估计数字。最终实际数字将在周三公布。
Realistically, a budget accounting item for contingency allowance should be established whenever a contingency amount was included in the final cost estimate.
在实际操作当中,无论详细的成本估算中是否包括了意外事件,项目预算都应列支一笔应急储备金。
Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
Although large workload, the final conclusion usage is uncertain for gross estimate error can't be calculated caused by investigation not being strictly random.
即使是花费了较大的工作量,但由于调查方法不是严格随机的,所以对总量的估计的误差也不能计算,因此最终对推断结果的使用也没有把握。
Moreover, the categories of cost accounts established within an organization may bear little resemblance to the quantities included in a final cost estimate.
此外,建立在组织内部的成本报告种类同详细的成本估算中的数量很少有相似之处。
The design method to estimate the bearing capacity of single pile base on the final pressure is presented in this paper, and the construction measures are discussed as well.
本文通过工程实例介绍了静压预应力高强管桩在某高层建筑中应用的设计思路,利用静压桩终压力估算单桩竖向承载力的设计方法及有关施工技术要求。
This formula can be used to estimate the final ultimate-bearing capacity of the pile.
应用该公式可估算出预制桩单桩最终极限承载力。
The agreement of the final computation results with the experimental data indicates this method could be used to estimate the model's RCS quickly and effectively at engineering analyses.
最终计算结果和试验结果吻合较好,表明这种方法估算目标RCS快捷有效,可以应用于工程分析。
Final budgetary is estimate design for computer assistance computation, also discussed some of the content of the forms and drawings.
最后的概算设计为计算机辅助计算,同时也给出了各部分内容相关的表格与图纸。
In China, for a long time, auditing completed final account (estimate) of construction project has been featured with a significant post-audit.
长期以来,我国工程项目竣工结(决)算审计带有明显的事后审计特征。
The final result of the model was the addition of the two model's validation values, and the root mean squared error of prediction (RMSEP) was used to estimate the mixed model.
最终预测结果为两个模型预测值之和, 以模型的预测标准偏差(RMSEP)作为评价指标, 以便考察新方法的有效性。
The final result of the model was the addition of the two model's validation values, and the root mean squared error of prediction (RMSEP) was used to estimate the mixed model.
最终预测结果为两个模型预测值之和, 以模型的预测标准偏差(RMSEP)作为评价指标, 以便考察新方法的有效性。
应用推荐