• There are two methods namely flood discharge tunnel and spillway selected and compared for flood discharge structure of the Hengquan Reservoir Project.

    洪家渡水电站泄洪隧洞设计优化,经多种设计方案比较论证,优选出适宜洞自然条件运行要求的方案三。

    youdao

  • As the high head, high velocity and large flow of flood discharge, the concrete of spillway tunnel in Xiaowan Hydropower Station is easy to be damaged by cavitation.

    小湾水电站泄洪洞泄洪时具有水头、高流速、泄量特点,混凝土冲刷力强,容易产生空蚀破坏

    youdao

  • It is showed that the appropriate design for inlet elevation, diameter and planar situation of a flood discharge tunnel is the key to the sedimentation engineering design for a reservoir.

    实践经验表明,水库工程泥沙设计关键在于合理确定泄洪排沙洞进口高程及其平面位置

    youdao

  • Owing to the reaction of flood discharge surge, the water oscillation at the exit of straight tunnel is larger than curved tunnel.

    对电站尾水洞比较水洞尾水洞两种布置形式。

    youdao

  • Owing to the reaction of flood discharge surge, the water oscillation at the exit of straight tunnel is larger than curved tunnel.

    对电站尾水洞比较水洞尾水洞两种布置形式。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定