The increase or decrease of the discharge, after Three-Gorge Project goes into operation, will change the sand exchange and silt deposition in Poyang Lake.
三峡工程运行后增减下泄流量,将使鄱阳湖的泥沙交换和淤积作用发生变化。
The increase or decrease of the discharge, after Three-Gorge Project goes into operation, will change the sand exchange and silt deposition in Poyang Lake.
三峡工程运行后增减下泄流量,将使鄱阳湖的泥沙交换和淤积作用发生变化。
应用推荐