Zoellick visited two projects that have been created to reach that goal: the Azito gas-fired station in Abidjan and the Bumbuna hydroelectric dam in Sierra Leone.
佐利克参观了为实现这一目标而实施的两个项目:位于阿比让的阿兹托燃气发电站和塞拉利昂的布姆·布纳水电大坝项目。
A new dam and hydroelectric power station crawl towards completion.
一座新的水坝与水利电气发电站正慢条不紊地接近竣工。
Indeed, Mozambique already has Africa's most powerful hydroelectric plant, the state-owned HCB power-station on the Cahora Bassa dam at Songo, some 200km (124 miles) north-west of Tete.
的确,莫桑比克已经拥有了非洲大陆最具能量的水力电气工厂,即位于太特城西北面约200公里处松戈卡堡拉-巴萨大坝上的国有hcb发电站。
In the Chongqing Jiangkou Hydroelectric Power Station, dam foundation stress cycle grows multitudinous bands, faults, limestone caves and other disadvantageous geological combination.
重庆江口水电站坝基应力范围内发育众多夹层、断层、溶洞等不利地质组合。
Middle the former hydroelectric station construction, the gravity dam mostly chooses on new and the complete rock mass, the rock mass quality is high.
以往的水电站建设当中,重力坝大都选择在新鲜和完整程度好的岩体上,岩体质量较高。
The excavation of the rolled concrete double-curvature arch dam and gravity dam in Dahuashui hydroelectric station in Guizhou adopted deep-hole graded slight differences demolition.
贵州大花水水电站碾压混凝土双曲拱坝、重力坝开挖采用深孔梯段微差爆破。
In hydroelectric power station of Li Jiaxia dam detection, the testing crack depth is deepest achieves about 1.1m.
在李家峡水电站主坝的检测中,检测裂缝深度最深达到1.1M左右。
In this paper the model testing during construction of the dam foundation built on right deep alluvion of the river valleys for a Hydroelectric power station are described.
本文论述了一座水电站河谷右深槽覆盖层坝基施工期地基模型试验。
Dam for a hydroelectric station on the road bridge in which the terrain, the location of the bridge lifting aspects of the analysis of factors to determine the bridge lifting program;
针对某电站上坝公路桥所处的地形、地理位置对桥梁吊装方面影响因素的分析,从而确定桥梁吊装方案;
Dam for a hydroelectric station on the road bridge in which the terrain, the location of the bridge lifting aspects of the analysis of factors to determine the bridge lifting program;
针对某电站上坝公路桥所处的地形、地理位置对桥梁吊装方面影响因素的分析,从而确定桥梁吊装方案;
应用推荐