• Based on the acoustic wave sounding of the dam foundation of a water control project, the continuous ratio of J1~J4 inter layer shear zone is infered by analyzing the acoustic velocity anomaly.

    水利枢纽工程坝基声波探测例 ,通过声速异常分析 ,对J1J4剪切连续进行了推定 ,其部分成果经开挖验证具有一定的可靠性。

    youdao

  • In the upper layer, there are the blocking speed-down zone inter-belt, the whirling speed-down zone behind the belt, the conflux accelerating zone just behind the top of shelterbelt.

    林带上部林带间阻滞减速和林带后的涡旋减速区,在林带后部有集流加速区。

    youdao

  • In the upper layer, there are the blocking speed-down zone inter-belt, the whirling speed-down zone behind the belt, the conflux accelerating zone just behind the top of shelterbelt.

    林带上部林带间阻滞减速和林带后的涡旋减速区,在林带后部有集流加速区。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定