• The technique conduce to decrease time due to installing headgear occupy shaft alone and cut construction time of whole mine.

    工艺减免井架施工工期、缩短整个矿井建设工期有一定的意义。

    youdao

  • For a long time, Chinese coal-mining cities always adopt the development mode of "development and construction around mine", and resulting in more scattered city space structure.

    长期以来,我国煤矿城市大多采取“缘而建”的开发模式由此形成较为分散城市空间结构。

    youdao

  • Be widely applied on various construction equipments with some features, big vibration and shock frequently, working long time, terrible environment machines, such as roller, grab, mine transporter.

    广泛应用震动幅度冲击频率高作业时间环境恶劣的各类工程机械压路机、挖掘机、矿山运输车辆等。

    youdao

  • The reasonable term of mining rights value calculation was proposed which was equal to the sum of mining rights service time and basic construction period before mine commissioning.

    一定时间范围内,同宗采矿权期限越长,采矿权价值就越大

    youdao

  • The reasonable term of mining rights value calculation was proposed which was equal to the sum of mining rights service time and basic construction period before mine commissioning.

    一定时间范围内,同宗采矿权期限越长,采矿权价值就越大

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定