• Through parameter calibration and model validation, model can be adapted to morphogenesis and LAI simulation for different varieties and management practice.

    通过模型参数校正核实,使模型适应不同类型品种形态发生和LAI动态模拟

    youdao

  • The main requirements for cm operational conceptual hydrologic model are function development, model calibration, and validation followed by production of forecast runs and analysis of results.

    功能改进模型率定,模型预报验证以及结果分析是应用概念水文模型所需要的几个主要部分。

    youdao

  • Meanwhile, the factors affecting the calibration model were studied and the validation was done by the actual sample.

    同时对影响模型因素进行研究,并用实际样品进行了验证

    youdao

  • Then, the calibration and validation of TOPOG model was done using the meteorological and hydrological data measured at the outlet of the watershed in 2001 and 2002.

    然后,用祁连山露沟小流域2001年、2002年气象水文数据对改进后TOPOG模型进行率定和检验

    youdao

  • Then, the calibration and validation of TOPOG model was done using the meteorological and hydrological data measured at the outlet of the watershed in 2001 and 2002.

    然后,用祁连山露沟小流域2001年、2002年气象水文数据对改进后TOPOG模型进行率定和检验

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定