• According to the request of short period production test, the bailing oil in cased well for pressure testing and open oil extraction technique have been developed.

    为解决以往试采方法只能录取产量资料而不能同时得井下流资料问题,根据短期试采要求研制出套管捞测压工艺开式试采工艺。

    youdao

  • However, two sets of channels should be used to perform open and short calibration, so the system can only test up to eight capacitors.

    然而通道必须用于进行开路短路校准所以系统最多测试8个电容器

    youdao

  • However, two sets of channels should be used to perform open and short calibration, so the system can only test up to eight capacitors.

    然而通道必须用于进行开路短路校准所以系统最多测试8个电容器

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定