Listening time counts as operating time.
守听时间也计算在操作时间内。
Powerful with long single operating time.
动力强,单次工作时间长。
Reduces rig-up time; Reduces operating time.
减少设备安装和作业时间。
Returnable time not less than 70% operating time.
可返回时间不小于动作时间的70%。
The operating time is also shortened significantly.
出血极少,明显缩短了手术时间。
Able to work under pressure and longer operating time.
能承受较大的工作压力和较长的工作时间。
It has advantages of simple step, shortening operating time and so on.
本发明具有步骤简单、缩短操作时间等优点。
Thus, it has saved the human resources and saved the precious operating time.
在节约了人力资源的同时,更是节省了宝贵的操作时间。
All charges will be based on an effective working or operating time fixed at 24 hours per day.
所有费用将基于一个有效的工作或工作时间固定在每天24小时不间断。
This equipment is fully automatic equipment, exquisite technology, save a lot of operating time.
此设备为全自动设备,技术精湛,节省大量操作时间。
Main outcome measures Recurrence rate, complication rate, hospital stay, nodal counts, blood loss, operating time.
主要测量结果:疾病的复发率,并发症发病率,住院时间,淋巴结计数,出血量,手术时间。
The maximum production capacity of filter press can be derived from optimum operating time rapidly and accurately.
相应地,当压滤机达到最大生产能力时的操作条件也能快速而准确的得到。
Conclusion This method has the advantages of light damage to orbital tissue, short operating time and good results.
结论此手术方法眶内组织损伤小,手术时间短,效果满意。
Objective:To explore a method to shorten operating time and to lower conversive rate of laparoscopic cholecystectomy(LC).
目的:探讨腹腔镜胆囊切除术(LC)缩短手术时间降低中转率的方法。
To observe and analyse the relationship between the operating time and the low degree intermittence exotropia in children.
观察和分析低度数儿童间歇性外斜视与其手术时机的选择。
During the compiling, it is of importance to have code optimization reduce the operating time and loading space of target code.
编译过程中,代码优化能减少目标代码的运行时间和存储空间,具有重要作用。
Objective To investigate the clinical characteristics, operating time and procedures of acute calculous cholecystitis in the elder.
目的探讨老年结石性急性胆囊炎的临床特点、手术时机与方式。
Conclusion (1) We advocate the principle for the operating time of VSD, that is early finding, early diagnosis and early treatment.
结论(1)VSD手术时机主张“三早”原则,即早发现、早诊断、早治疗。
When the operating time is constant, the plastic film cover of precipitation is decided by the rainfall duration and daily evaporation.
当操作时间一定时,塑苫的降水量由降水持续时间和日蒸发量决定。
For diesel locomotive in China the idle hours take up 30% of the total operating time, and the fuel oil is consumed in a great quantity.
我国铁路内燃机车惰性运转的时间占全部运转时间的30 %,消耗大量的燃油。
Thicker carbon layers at the same packing density can enlarger the operating time of DCFC in one period without harming the performances.
相同的堆积密度下,选择稍厚的碳层可以延长电池一个周期内的使用时间同时对电池性能影响不大。
This paper is to demonstrate two parameters of earth-leakage protection relevant to safety-value of operating resistance and operating time.
本文的目的在于论述与安全有关的漏电保护的两个参数——动作电阻值和动作时间。
The baseline information of the patients, such as gender, age, weight and operating time etc. , was similar between the two groups (P > 0.05).
两组患者性别、年龄、体质量、手术时间等基线资料基本相似(P>0.05)。
Objectives: To analyze the thermal effect and the appropriate operating time of vibrating manipulation with the Infrared Thermogram technology.
目的:通过红外热像技术,分析确定振法的热效应及操作时间的客观化标准。
The weight loss feeder designed according to operating time controlled weight loss principle is a kind of continuous weighing feeding equipment.
失重式给料机根据工作时控制重量损失的原理设计,是一种具有计量功能的连续给料设备。
This paper briefly describes the cost-effectiveness analysis in respect to its conception, evaluating index, method, procedure and operating time etc.
本文对成本-效用分析的概念、评价指标、方法、步骤和运用的时机等进行了概括性的阐述;
It is assumed that the operating time of units has an exponential distribution, while the repair-time and the vacation time have general continuous distributions.
假定部件的工作时间服从指数分布,修理时间和修理工的休假时间均服从一般连续分布。
Clustering method balances the method's performance and processing speed, totally to obtain better tracking results by reducing operating time in most situations.
采用聚类方法在一定程度上平衡了跟踪效果和程序运行速度,总的看来在大部分情况下可以减少运算次数且获得较好的跟踪结果。
Results: There were no differences in age, body weight, previous laparotomy , the size of cysts, operating time and rupture rates of cysts between two groups ( P>0.05).
结果:两组在年龄、体重、剖腹术史、囊肿大小、病理类型等方面差异无显著性(P>0.05)。
The total wireline operating time of 67.5 hours for five runs was approximately 40% less than the estimated time for a similar e-coil intervention — approximately five days.
5次电缆作业总操作时间为67.5小时,比带电缆的连续油管作业节约至少约40%的时间,后者作业时间大约为5天。
应用推荐