According to the bearing mechanics and characteristics of pipe sinking gravel compaction pile and CFG pile the bearing capacity calculation method of this combined composite foundation is analyzed.
根据沉管挤密碎石桩和CFG桩组合型地基的承载机理和特性,分析了该组合型复合地基承载力的计算方法。
Combined with the pile foundation construction of Wuzhou city Hedong flood dike, the author introduced his opinion on quality control of sunk pipe filling pile construction.
结合梧州市河东防洪堤工程的桩基础施工,谈谈如何控制沉管灌注桩施工的质量。
This paper analyzes the present situation of pile foundation construction technology in Hengyang, introduces the application condition of prestressed high strength concrete pipe pile.
该文分析了衡阳地区桩基础施工工艺现状,介绍了预应力高强混凝土管桩应用条件。
The prestressed RC pipe pile is used in foundation design according to the ground condition, and the calculation settlement satisfies the requirement.
根据工程场地情况,基础采用预应力混凝土管桩,计算沉降量满足要求。
Based on the relation of pile with earth, cancel the slab to design container foundation adopting high intensity prestressed pipe pile.
根据桩土体系之间的关系,取消承台,对罐基础采用高强预应力管桩的桩土复合地基设计。
The construction condition, technology and procedure for steel pipe concrete pile supported by anchor foundation at the north, Renyang Bridge and the quality detection are introduced in the paper.
简要介绍润扬大桥北锚碇基础支撑钢管混凝土桩的施工条件、施工工艺和施工过程以及质量检测。
Some general features of pipe pile composite foundation settlement derived from the typical geology background of silty clay, silty soil and shallow water level in Zhengzhou are summarized.
通过实测结果和理论计算结果的对比分析,总结了适合郑州市郑东新区以粉质粘土、粉土为主,地下水位较浅的典型地质背景下的管桩复合地基沉降变形的一般规律。
With vertical pipe shield and underwater pile-foundation, a protection frame for wellhead is designed for the development of offshore marginal field.
设计了一种适用于海上边际油气田开发的垂直护管水下桩基式井口保护架。
Through synthetical analysis, the application of the cement mixing pile to treat soft foundation is studied in the paper. The question of applying the prestressed concrete pipe pile is discussed.
经过综合分析,探讨了水泥搅拌桩在淤泥质软粘土中地基加固法,分析了预应力混凝土管桩问题的处理,提出了灌注桩在不同地质条件下的措施等方法。
But pipe pile foundation has also its limitation and disadvantage. The paper states the suitable condition and characteristics of design and construction of prestressed pipe pile.
文中综合论述预应力管桩基础的适用条件及设计与施工特点。
Technical scheme, design, construction and application of steel pipe soil nail combining rabbling pile in a foundation ditch support in Shenzhen.
介绍了深圳某基坑支护工程钢管土钉与搅拌桩组合支护技术方案、设计、施工及应用情况。
Since deep penetration large diameter steel pipe piles have been widely used in platform foundation, pile drivability analysis and blow count prediction play an important role in pipe driving.
大直径超长桩的出现给海上的打桩施工增加了难度和复杂性,也使得打桩分析和预估锤击数具有重要的意义。
Arranging observation pile has instructive significance to the construction of pre-stressed concrete pipe pile in soft soil foundation.
设置观测桩对预应力混凝土管桩在软土地基施工中具有指导意义。
Pre-stressed pipe pile foundation is used in the gymnasium of certain primary school, in which some pile-heads of them are deviated during the course of constructing.
通过对某小学活动馆的预应力管桩基础在施工过程中出现的桩头偏位的情况进行分析与处理,取得了较好的实用效果并得到了一些有益的经验。
Based on a foundation treatment project, karst cave grouting, jet grouting pile and steel pipe pile as well as their applications in actual engineering project were presented.
据此,详细介绍灌浆技术在岩溶地区处理涌水溶洞时的具体应用,这对于其他类型的堵漏及地基加固项目也可提供一定的参考。
The cutting machine and the cutting method solve the technical problems of cutting of the steel pipe pile and are particularly suitable for project cleaning of a complete stage of the pile foundation.
解决了钢管桩切割的技术问题,尤其适用于桩基完成阶段的项目清理。
Therefore the building prefabricated circular pipe pile of the utility model can be used for not only underground foundation but also above-ground building column.
因此本实用新型建筑预制圆管桩既可被用作地下的基础部分,也可同时作为地面上的建筑物的立柱。
Through the computation of ultimate vertical bearing capacity of a single pile and design pile layout and so on, summarized experience of designation about prestressed concrete pipe pile foundation.
介绍了一个应用预应力高强混凝土管桩的工程实例,通过单桩竖向极限承载力计算和布桩设计等多方面的设计过程,总结了在预应力高强混凝土管桩设计中的心得体会。
Combining with some seismic damage examples and according to the principles of seismic design of pile foundation, the behavior of PHC pipe piles under earthquake action was analyzed.
结合桩基工程震害实例,依据桩基抗震设计原则,研究PHC管桩受地震作用的表现性状。
Based on Caishikou Station engineering of Beijing Metro Line 4, construction plan demonstration, technology measures and test technology about pile foundation of steel pipe column are introduced.
基于北京地铁四号线菜市口车站工程,介绍了钢管柱桩基的施工方案论证、技术措施和检测试验技术。
Based on Caishikou Station engineering of Beijing Metro Line 4, construction plan demonstration, technology measures and test technology about pile foundation of steel pipe column are introduced.
基于北京地铁四号线菜市口车站工程,介绍了钢管柱桩基的施工方案论证、技术措施和检测试验技术。
应用推荐