With the comparison of planned cost and actual cost, we carry out cost dynamic control.
采用计划成本与实际成本的比较,进行成本动态控制。
The actual cost is greater than or smaller than the difference of the standard cost (or cost of quota, planned costs).
实际成本大于或小于标准成本(或定额成本、计划成本)的差额。
The construction cost supervision is of great importance for the performance of a project construction with required quality and planned cost within the given time.
工程造价监理对工程建设按照规定的工期、质量、造价执行至关重要。
And at the time setting up the system of the planned cost accounting, the hospital deal with the relation in order between the planned cost accounting and service of medical treatment.
在建设成本核算体系的同时,医院也要注意成本核算与医疗服务等各种关系的处理。
Software projects rarely do as well as planned and, as a result, far too often we have to visit our iron triangle of scope, cost, and time.
软件项目很少能够做好计划,作为结果,我们最常见的就是在范围、费用和时间的铁三角中平衡。
Determined the effective cost of planned and unplanned outages, and hence the justifiable expense of additional redundant capacity to prevent them.
决定计划的和未计划的中断的实际成本,并因而确定合理的附加冗余容量成本来防止它们。
The cost of a planned outage of up to 6 hours overnight is c thousand dollars.
一个长达6小时的计划中断在过了一个晚上之后的花费是c千美元。
Is that always true, or is the cost less for a regular, planned outage than for a surprise unplanned outage?
这总是正确的吗,或一个常见的、预期的问题会比一个突发情况花费要少?
On one hand they are told to be agile, flexible, and adaptable, but on the other they are told to conform to pre-planned traditional Iron Triangle framework of scope, schedule, and cost.
一方面,人们告诉他们要敏捷、灵活、学会自我调整,另一方面,人们又告诉他们要遵从原有的传统铁三角框架,即范围、成本和日程。
Briefly presents three mainly used methods for calculating water price: marginal cost method, planned price method and cost method.
阐述了我国目前主要采用的三种水价核算方法:边际成本法、计划定价法和成本核算法。
Re-investment in the Kiowa fleet is planned to cost about USD4 million per aircraft and is hoped to keep the helicopters up to date and flying until 2020, Gen Thurman said during on 6 January.
Thurman将军1月6日说,对“奇奥瓦战士”机队的再次投入为每架飞机400万美元,有望使该型飞机跟上时代并能服役到2020年。
Reed and Weill say their planned corporate marriage is not about cost-cutting.
芦苇和魏尔说,他们的计划,公司的婚姻并不在于削减成本。
Manage the planned production programme whilst delivering Safety & Environment, Quality, Delivery, Cost, Human Resource and Machine Targets.
在管理生产项目的同时完成安全&环境,质量,交付,成本,人力及设备目标。
Their operation and management have ever since been organized in the planned economy mode and organization structure, with low efficiency and persistently high management cost.
长期处于计划经济管理模式下形成的管理模式和组织结构,工作效率低下,管理成本居高不下。
The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.
属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用,监视和控制。
To ensure the produce in the period of planned economy, the cost is not calculated.
在计划经济时期为保证原油生产,不计费用;
The supply price is relied on the cost for the emission reduction, the its differential coefficient of the cost , the capital value, and the planned emission reduction in the life cycle.
其大小取决于其国内减排成本、减排成本的变化情况、卖出减排量时资金的价值、以及国家在卖出减排量寿期内计划投产的减排能力。
The engineering cost is the price of engineering, which usually consists of direct fee, overheads, planned profit and tax.
工程造价通常讲就是工程的价格,一般由直接费、间接费、计划利润和税金组成。
The ability is currently planned to have no cooldown, cost 10 Rage, and have a 9-second duration.
目前计划的能力是有没有冷却时间,成本10点怒气,并有9秒的时间。
An investigation by Mr. Cuomo's office found that various doctor-rating systems currently used or planned by insurers are based primarily on the cost of care, not its quality.
库默先生办公室的工作人员经过调查,发现目前各保险公司正在使用或计划使用的各种各样的医生评估制度,主要依据医疗费用,而不是医疗质量。
Cost control scheme is planned results, should cost to increase cost factors and cost advantage for one.
成本控制方案是成本策划的结果,应针对提高成本因素和成本优势逐一制定。
The direct and indirect cost caused by land appropriation for the channels can be easily calculated and is easy to be planned.
排水渠占用面积而造成的直接和间接成本,可以简单计算,方便规划。
Chernoff added that Murray planned to attend to patients in Las Vegas as well, but the cost of reopening his clinic there was "prohibitive."
契诺夫还说穆里也计划去拉斯维加斯工作,但他“无力承受”重开诊所的费用。
Briefly presents 3 mainly used methods for calculating water price: marginal cost method, planned price and cost price.
阐述了常用的三种水价核算方法:边际成本定价法、计划订价法和成本核算法。
The content of cost management by planned target is presented.
介绍了目标成本管理的内容。
By using these project management methods and skills, this project was undertaken successfully following the planned schedule and estimated cost.
综合运用各种项目管理方法和手段,有效地保证了项目的进度实施和成本控制。
Mr Warren said he expected to spend about $400,000 on a two-week jaunt next month, including the cost of ships he planned to rent and a remote-operated submarine.
沃伦预计, 从下月开始的为期两周的航行将花费40万美元,这些费用包括租赁船只以及一艘远程控制的潜水艇的价钱。
At present, we have been set up our own stable partner overseas, and combined with your needs, we controled the cost effectively and planned a successful exhibition for you.
目前我们已经在海外建立了自己的稳定的合作伙伴,并结合您的需要,有效的控制了成本,为您精心安排策划一场成功的展会。
At present, we have been set up our own stable partner overseas, and combined with your needs, we controled the cost effectively and planned a successful exhibition for you.
目前我们已经在海外建立了自己的稳定的合作伙伴,并结合您的需要,有效的控制了成本,为您精心安排策划一场成功的展会。
应用推荐