• In summary, China should become a major economic power house in the next century.

    而言之,中国应该在下世纪成为主要经济强国

    youdao

  • The layout of underground power house of Baise project is limited by the special geologic condition.

    百色水利枢纽地下厂房布置地质条件限制性较强。

    youdao

  • The problem of the heat power house pipe encrustation filthiness influences the normal running of dynamotors seriously.

    热电厂输灰管道结问题影响发电机组正常运行

    youdao

  • In the grandfather's eyes, my mother is a bad woman, in charge of the financial power house, but also ordered a size go to work.

    爷爷眼中妈妈是个女人掌管家里财政大权指使一家大小干活。

    youdao

  • The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.

    小山水电站工程钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。

    youdao

  • You are like the owner of a power house that supplies electricity for light and heat and power to the homes and the factories around you.

    像这座能源宝库主人一样,这个能源库身边厂房提供电力照明热能

    youdao

  • Some conclusions assumed from the research and design of Jiangkou power house is quite useful for all the underground Hydropower Station.

    本文观点结论地下厂房工程设计有着一定的普遍意义

    youdao

  • The analyses and research are based on underground power house of Three Gorges Hydropower Station which has the specific background of engineering.

    本文的分析研究基于三峡电源电站地下厂房工程明确工程实践背景

    youdao

  • Its products are extensively used in metallurgy, mining, steel production, power house, docks, paper making, cement facture, and coal mine and so on.

    产品广泛用于冶金矿山钢铁电力、港口、码头、造纸、水泥煤矿行业。

    youdao

  • Locating the power house is one of the most important problems for the project not only in the conditions for construction but also in economic cost.

    厂房位置的选取不论是施工条件上,还是经济造价上,都工程重要问题之一。

    youdao

  • Finally, the selection of underground power house axis and the lining design scheme for the pressure tunnel are discussed based on the in-situ stress.

    最后地应力角度,讨论地下厂房轴线选择高压隧洞衬砌设计方案

    youdao

  • Based on the discontinuous deformation analysis (DDA), the stability of the high rock slope behind the power house of Jiudianxia hydroelectric station was studied.

    应用非连续变形分析(DDA)对九甸峡水电站厂房岩体高边坡进行稳定性分析研究,建立DDA块体系统分析模型。

    youdao

  • The numerical study shows that the weak position is not located at the middle of the powerhouse, but at the part with certain distance to one end of the power house.

    泰安抽水蓄能电站地下围岩稳定性进行三维有限元数值模拟研究,结果表明围岩薄弱部位有时可能洞端一定距离上;

    youdao

  • How to solve the problems of the safety and stability of the surrounding rock is a difficult point for the design and construction of Longtan Underground Power House.

    如何解决好围岩安全稳定龙滩地下厂房设计施工难点问题

    youdao

  • This starter is mainly applied to soft start and soft stop for production equipments in coal mine, strip coal mine, metallurgy, harbor coal washery, power house, etc.

    起动主要用于井工煤矿、露天煤矿、滞金港口选煤厂发电厂生产设备起动停车

    youdao

  • An structure analysis in columnar power house of Extension Project of Dahua hydropower station is made by 3d element program and considering three different water levels.

    大化水电站扩建工程圆筒式厂房,3种不同水位下,通过有限元程序进行了结构分析,结果表明圆筒结构合理。

    youdao

  • With the influence of so many cracks, the strength, stiffness and stability of the umbrella arch is decreased greatly, which endangers the operation of underground power house.

    数目众多纵、横向裂缝大大削弱了混凝土强度刚度稳定性危及地下厂房的安全运行

    youdao

  • Just a short time ago, most of us could not care less to learn Chinese but nowadays many want at least their children to have some kind of knowledge about the uprising global power house.

    不久前我们中的大部分学习中文不闻不问,但是现在许多人(至少他们孩子)打算学习一些有关这股新兴全球力量的知识

    youdao

  • Milling system : cracker, muller, milling machine, conveyor, hoist , material house, fluidized bed furnace, helix mixing blade, ripe power house, static dust catcher and shaking motor.

    系统:由鄂破粉碎机机、输送机提升机、生料仓、沸腾炉螺旋粉料仓、静电除尘器电机组成。

    youdao

  • In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section, the blasting method was used in Jinghong power station.

    景洪水电站主厂房右侧紧邻右冲底孔,右冲沙底孔作为二期纵向围堰组成部分,在主厂房开挖前已经形成。

    youdao

  • "Power house" industrial chillers are perfect assistants for industry machinery due to the stable performance, strong cooling capacity, pretty appearance, simple installation and easy maintenance.

    力源牌工业冷水工业机械的理想配套设备,产品具有性能稳定强劲外观美观、小巧玲珑、安装简单维修方便等优点。

    youdao

  • This paper introduces briefly the layout of the power house and the main structure design condition of the main power house under the circumstances of construction, operation and cross application.

    概述了天湖水电站厂房布置厂房在施工运行交叉应用工况主要结构设计情况。

    youdao

  • The project is consisted of a modern hoggery, goose house and methane power plant.

    项目现代化养猪场、现代化养场、以及沼气发电厂组成。

    youdao

  • His whole house had a power cut.

    的整个房子都停电了。

    youdao

  • Critics of the new law said it would be an abuse of power to let the White House control the Internet.

    批评人士称,这项法案白宫控制网络滥用权力

    youdao

  • There were more jobs there now and even though salaries were lower, they would have much more spending power and could afford their own house.

    现在那里有更多工作机会尽管工资低了点,但是他们更高消费力而且得起房子。

    youdao

  • There were more jobs there now and even though salaries were lower, they would have much more spending power and could afford their own house.

    现在那里有更多工作机会尽管工资低了点,但是他们更高消费力而且得起房子。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定