• The blackstart power source planning model based on minimization of social interruption cost is proposed to optimize the capacity and location of the blackstart unit.

    建立了以社会停电损失最小为目标的黑启动电源规划模型,用以优化黑启动电源的安装位置及容量。

    youdao

  • Power outage cost is used to measure the economic losses incurred by power customers during the period of power interruption or electric load constraint.

    缺电成本用于衡量断电或限电时用户的经济损失。

    youdao

  • Power customer interruption cost functions (PCICF) are important for power system planning, operation, and security pricing under deregulation.

    电力用户停电损失函数对电力系统规划、运行和电力市场下的安全费用计算等具有重要意义。

    youdao

  • Taking the reliability of power supply into consideration and transforming it into the interruption cost in economy analysis are the necessary trend of the urban network planning.

    考虑供电可靠性并将其转化为停电损失费用来进行经济分析是城市电网规划的必然趋势。

    youdao

  • Taking the reliability of power supply into consideration and transforming it into the interruption cost in economy analysis are the necessary trend of the urban network planning.

    考虑供电可靠性并将其转化为停电损失费用来进行经济分析是城市电网规划的必然趋势。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定