• The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.

    地下厂房进水口高边坡稳定龙滩水电站建设必须解决重大工程技术问题

    youdao

  • Unit foundation of powerhouse of large scale hydropower station need bear very heavy dynamic load, generally used cylinder form, the foundation with non cylinder form has not been applied in home.

    大型水电站厂房机墩结构承受巨大动力荷载通常采用圆筒式机墩,圆筒型机墩国内尚无应用

    youdao

  • The underground powerhouse of Pubugou Hydropower Station is located in the complex geological environments. Rockburst happens frequently during the excavation of powerhouse.

    瀑布水电站地下厂房赋存复杂地质环境中,厂房开挖过程中岩爆活动频繁

    youdao

  • Yinzidu hydropower station has diversion-type ground powerhouse with the characteristics of compact layout and not disturbed by construction.

    引子水电站引水地面厂房,厂区布置紧凑,无施工干扰

    youdao

  • The layout and design of the bent structure of Powerhouse of Jilintai No. 1 Hydropower Station were expounded in this paper.

    全面地介绍了新疆吉林台一级水电站工程主厂房排架布置设计情况。

    youdao

  • The layout and design of the bent structure of Powerhouse of Jilintai No. 1 Hydropower Station were expounded in this paper.

    全面地介绍了新疆吉林台一级水电站工程主厂房排架布置设计情况。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定