Test results have indicated that under rated load, the heat efficiency of the new burner is 30 ~ 50% higher than that of the ordinary ones.
测定结果表明,这种燃烧器在额定负荷下的热效率比目前常用的燃烧器提高30—50%。
While designing the locomotive-type diesel engine, the selection and setting of many parameters emphasize on the whole performance of the engine with rated load.
在设计机车柴油机时,许多参数的选择和设定主要着眼于柴油机标定工况下的整机性能。
When motor carries 30% rated load, the system efficiency may raise about9%.
当电机运行于30%额定负载时,可提高效率9%左右。
Traditionally, the vehicle overload is defined as the load that exceeds its rated load.
传统意义上车辆的超载是指车辆当前负荷高于该车型的额定载荷。
The boiler can combust stably at the rated load scope of 30~100% when burning the design coal.
本锅炉在燃用设计煤种时锅炉能够在30~100%额定负荷范围内稳定燃烧。
Since the high power factor is 99% or higher (at rated load), the power capacity can be greatly reduced.
由于高功率因数是99%以上(额定负荷),电力容量可大为减少。
Apply150% rated load at rated power factor and measure the time required for the inverter protective devices to operate.
在额定功率因素上施加150%额定负荷,并测量逆变器保护装置启动所需时间。
At the same time, leakage magnetic coefficient of commutating pole is calculated and analyzed by magnetic flux in itself and gap at rated load.
同时,利用额定负载时换向极身中的磁通与穿过气隙的总磁通,对换向极漏磁系数进行了计算与分析。
IPS automatically shutdown if overload exceeds 120% of normal value for 10 seconds, IPS automatically resume work if overload comes to rated load.
当负载超过120%时,10秒后,IPS自动关闭输出;当负载恢复到额定负载后,IPS自动恢复正常工作。
The operating conditions are those steady state conditions, such as the one with rated load, the one after load regulation and the one after field regulation.
运行状态包括额定负荷、负荷调节后的稳态及励磁调节后的稳态。
In order to test the working ability of the equipment under rated load, the load test can be carried out according to the percentage increasing mode of the design center.
小型加工中心负荷试验主要是为了检验设备在额定负荷下的工作能力,负荷试验可按加工中心设计功率的百分比递增方式顺序进行。
After the improvement, the stable combustion test load without firing oil is as low as 45% of rated load, which greatly enhanced the ability of in depth peak load cycling.
改造后其不投油稳燃试验负荷达到了45%,大大提高了锅炉的深度调峰能力。
Under the condition of rated load and rated speed operation of a generator set, over-vibration phenomena appeared in the planetary gearbox's bearing and the rear bearing of the generator.
某带行星齿轮减速器的发电机组在满负荷额定转速工况下,出现减速器轴承及发电机后轴承处横向振动偏大的故障现象。
By analyzing the hoisting and feeding-off models under the rated load, the maximum dynamic loads and dynamic coefficients of fast line, dead line, every travelling line and derrick were obtained.
对仿真模型在额定工况时的起升、下钻过程进行了仿真运算,得到了游动系统中快绳、死绳、各游绳及井架上的最大动载荷和动载系数。
Aiming at the problem of net-shell connector's rated load not meeting the requirement of overhead transmission line construction, a special traction tube was developed to help with tension stringing.
针对网套式连接器的额定载荷目前还不能满足架空输电线路工程施工要求这一问题,为方便张力放线试制了一种专用的牵引管。
Aiming at the problem of net-shell connector's rated load not meeting the requirement of overhead transmission line construction, a special traction tube was developed to help with tension stringing.
针对网套式连接器的额定载荷目前还不能满足架空输电线路工程施工要求这一问题,为方便张力放线试制了一种专用的牵引管。
应用推荐