• In 1982, West pumping station began to operate, improved water cycle, the salt quantity flow out of Bositeng Lake increased, slow down the quality deteriorating of Big Lake water.

    1982年西泵站投入运行后,水循环方式改善,博湖盐量增加缓解大湖水质的持续恶化

    youdao

  • In 1982, West pumping station began to operate, improved water cycle, the salt quantity flow out of Bositeng Lake increased, slow down the quality deteriorating of Big Lake water.

    1982年西泵站投入运行后,水循环方式改善,博湖盐量增加缓解大湖水质的持续恶化

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定