• THE risk of a nuclear accident at a huge power plant in disaster-strewn north-eastern Japan has risen for a second day on March 13th.

    位于日本东北灾区巨大核电厂出现事故,发生核事故的第二,即3月13日,核泄漏的风险正在上升

    youdao

  • In the neighboring hall there is the turbine - the second most important unit in a nuclear power plant.

    邻近大厅安装着汽轮机,核电厂里第二重要单元设备

    youdao

  • The headline news for the coal industry in 2010 was what didn't happen: Construction did not begin on a single new coal-fired power plant in the United States for the second straight year.

    发生的事才能成为新闻,但2010年煤炭行业没有发生事情却成了今日的头条美国已是连续第二年没有开工建设新的燃煤发电厂了。

    youdao

  • The second group: Wang Fangjun responsible for carrying out the supervision and the first steel plant, the second steel plant, power plant activities.

    第二王方军负责督导第一炼钢厂、第二炼钢厂、动力厂活动开展情况。

    youdao

  • The combustion stability of an imported 800MW boiler in Suizhong Power Plant is controlled by its central air quantity and the vane angle of second air.

    绥中电厂引进800MW锅炉机组燃烧稳定性通过调整中心风量二次风叶片角度得到的。

    youdao

  • I moved to second shift because I knew my expertise with power plant work was critically needed there.

    第二原因是因为知道电厂工作经验在这里非常需要的。

    youdao

  • Its a kernel of thermal system analysis in power plant based on the second law of thermodynamics that the exhaust coefficient of a steam turbine is calculated.

    热力学第二定律基础火电厂热力系统分析方法核心汽轮机系数的确定。

    youdao

  • Coal ranks in the Yuanyanghu mine area are mainly non-caking coal, long flame coal the second, all good coals for coal chemical industry and power plant.

    鸳鸯湖矿区不粘为主煤次之,良好煤化工动力用煤。

    youdao

  • Describing the background of advanced nuclear power plant idea against the problems of second-generation nuclear power plants, and providing a technical analysis on advanced nuclear power plant idea.

    通过第二核电厂所面临问题,探讨了先进核电厂概念提出的背景先进核电厂的技术内涵进行了初步分析

    youdao

  • In the end, based on electricity, the calculating methods for the cost and benefit of heating and electricity are studied, which are applied to air-cooled unit of BaoTou Second Thermal Power Plant.

    最后,以电量为基础研究了热电联产产品成本效益计算方法将其应用包头二热机组的成本效益分析中。

    youdao

  • The microcomputer monitoring system developed for the net control office in the Second Changchun thermal power plant is introduced.

    介绍了长春热电开发微机监测系统

    youdao

  • The second phase extension projects of Qin Shan as well as Qin Shan nuclear power plant which is called Fang Jia Shan nuclear power project, have begun to construct.

    秦山扩建项目和秦山核电厂扩建项目方家山核电工程也已动工建设

    youdao

  • The finite element method is used to analyse the natural vibration of a exhaust chimney with steel structure in a nuclear power plant, such as the first, the second frequency and their model.

    利用有限元分析了某核电站排气钢塔固有振动特性,即一阶、阶振动频率振型。

    youdao

  • The paper summarizes diagnosis treatment of axle vibration & No. 2 bearing pad burnt-out which happened on unit 1, Baoji No. 2 power plant, at second half of year 1999.

    总结宝鸡发电厂1机组1999年下半年发生轴系振动2轴承烧瓦诊断处理

    youdao

  • He calculates that all the emissions from a gigawatt coal-fired power plant could be lifted away using a single engine with a nozzle speed of 460 metres a second.

    计算,使用为每秒460米的台喷气发动机便将容量一千兆瓦燃煤发电厂所有排放物

    youdao

  • Second, the ROK side said that it was seeking cooperation of the Chinese authority to deal with the cyber attack on its nuclear power plant operator.

    第二韩国方面表示将寻求与中方合作解决针对韩国核电站网络攻击活动,中方是否了解有关情况?

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值燃料管理方案

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值燃料管理方案

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定