THE risk of a nuclear accident at a huge power plant in disaster-strewn north-eastern Japan has risen for a second day on March 13th.
位于日本东北灾区的巨大核电厂出现了核事故,发生核事故的第二天,即3月13日,核泄漏的风险正在上升。
In the neighboring hall there is the turbine - the second most important unit in a nuclear power plant.
邻近的大厅安装着汽轮机,这是核电厂里第二重要的单元设备。
The headline news for the coal industry in 2010 was what didn't happen: Construction did not begin on a single new coal-fired power plant in the United States for the second straight year.
发生了的事才能成为新闻,但2010年煤炭行业一件没有发生的事情却成了今日的头条:美国已是连续第二年没有开工建设新的燃煤发电厂了。
The second group: Wang Fangjun responsible for carrying out the supervision and the first steel plant, the second steel plant, power plant activities.
第二组:王方军负责督导第一炼钢厂、第二炼钢厂、动力厂活动的开展情况。
The combustion stability of an imported 800MW boiler in Suizhong Power Plant is controlled by its central air quantity and the vane angle of second air.
绥中电厂引进的800MW锅炉机组燃烧稳定性是通过调整中心风量和二次风叶片角度得到的。
I moved to second shift because I knew my expertise with power plant work was critically needed there.
我转到第二班的原因是因为我知道我在电厂工作的经验在这里是非常需要的。
Its a kernel of thermal system analysis in power plant based on the second law of thermodynamics that the exhaust coefficient of a steam turbine is calculated.
以热力学第二定律为基础的火电厂热力系统分析方法核心是汽轮机排汽系数的确定。
Coal ranks in the Yuanyanghu mine area are mainly non-caking coal, long flame coal the second, all good coals for coal chemical industry and power plant.
鸳鸯湖矿区以不粘煤为主,长焰煤次之,是良好的煤化工和动力用煤。
Describing the background of advanced nuclear power plant idea against the problems of second-generation nuclear power plants, and providing a technical analysis on advanced nuclear power plant idea.
通过第二代核电厂所面临的问题,探讨了先进核电厂概念提出的背景,并对先进核电厂的技术内涵进行了初步分析。
In the end, based on electricity, the calculating methods for the cost and benefit of heating and electricity are studied, which are applied to air-cooled unit of BaoTou Second Thermal Power Plant.
最后,以电量法为基础,研究了热电联产热、电产品的成本效益计算方法,并将其应用于包头二热空冷机组的成本效益分析中。
The microcomputer monitoring system developed for the net control office in the Second Changchun thermal power plant is introduced.
介绍了为长春热电二厂网控室开发的微机监测系统。
The second phase extension projects of Qin Shan as well as Qin Shan nuclear power plant which is called Fang Jia Shan nuclear power project, have begun to construct.
秦山二期扩建项目和秦山核电厂扩建项目方家山核电工程也已动工建设。
The finite element method is used to analyse the natural vibration of a exhaust chimney with steel structure in a nuclear power plant, such as the first, the second frequency and their model.
利用有限元法分析了某核电站排气钢塔的固有振动特性,即一阶、二阶振动频率及振型。
The paper summarizes diagnosis treatment of axle vibration & No. 2 bearing pad burnt-out which happened on unit 1, Baoji No. 2 power plant, at second half of year 1999.
总结了宝鸡发电厂二厂1号机组1999年下半年发生轴系振动及2号轴承烧瓦的诊断处理。
He calculates that all the emissions from a gigawatt coal-fired power plant could be lifted away using a single engine with a nozzle speed of 460 metres a second.
据其计算,使用喷速为每秒460米的单台喷气发动机便可将容量一千兆瓦的燃煤发电厂所有的排放物吹散。
Second, the ROK side said that it was seeking cooperation of the Chinese authority to deal with the cyber attack on its nuclear power plant operator.
第二,韩国方面表示将寻求与中方合作解决针对韩国核电站的网络攻击活动,中方是否了解有关情况?
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
应用推荐