• According to the request of short period production test, the bailing oil in cased well for pressure testing and open oil extraction technique have been developed.

    为解决以往试采方法只能录取产量资料而不能同时得井下流资料问题,根据短期试采要求研制出套管捞测压工艺开式试采工艺。

    youdao

  • Steam drive pilot test in Block Qi40 has achieved ideal development result, but the sweep efficiency is low and stable production period is short because of reservoir heterogeneity.

    齐40蒸汽先导试验取得了较为理想的开发效果由于油藏非均质性的影响,蒸汽驱过程中出现了蒸汽波及效率稳产时间短等现象。

    youdao

  • Steam drive pilot test in Block Qi40 has achieved ideal development result, but the sweep efficiency is low and stable production period is short because of reservoir heterogeneity.

    齐40蒸汽先导试验取得了较为理想的开发效果由于油藏非均质性的影响,蒸汽驱过程中出现了蒸汽波及效率稳产时间短等现象。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定