The result shows that if the cooling system of the spent fuel storage pool can be retrieved in 19 hours, the natural circulation cooling ability is sufficient to prevent radioactivity release.
计算结果表明。恰希玛核电厂乏燃料池冷却系统失效后,只要在19 个小时内修复冷却系统, 不会出现大量放射性物质外泄。
The result shows that if the cooling system of the spent fuel storage pool can be retrieved in 19 hours, the natural circulation cooling ability is sufficient to prevent radioactivity release.
计算结果表明。恰希玛核电厂乏燃料池冷却系统失效后,只要在19 个小时内修复冷却系统, 不会出现大量放射性物质外泄。