• Because the steel structure installment and the construction restrict mutually, steel frame-core tube structure in construction process causes the whole construction process lag.

    框架-核心结构施工过程中,由于钢结构安装土建施工相互制约,致使整体施工进度滞后

    youdao

  • The steel frame and core tube are connected by composite beams to work together, and repeated axial forces would be created within the composite beams.

    楼板钢梁构成的组合梁框架核心连接起来迫使其协同工作,在组合梁产生反复力作用。

    youdao

  • Steel grid-concrete frame column-concrete giant column (core tube) structure is adopted and the seismic action of integral structural is analyzed.

    结构设计中采用网架-框架柱-巨型(核心)结构体系,通过结构整体建模分析地震力影响。

    youdao

  • Steel grid-concrete frame column-concrete giant column (core tube) structure is adopted and the seismic action of integral structural is analyzed.

    结构设计中采用网架-框架柱-巨型(核心)结构体系,通过结构整体建模分析地震力影响。

    youdao