Programmed after construction began on a sub-surface parking structure beneath the building site, the Project required carefully planning to be built atop that structural system.
建筑场地已建造好地下首层停车结构,为在此结构系统上方继续建造地表工程,此项目还需要谨慎规划。
Programmed after construction began on a sub-surface parking structure beneath the building site, the Project required carefully planning to be built atop that structural system.
建筑场地已建造好地下首层停车结构,为在此结构系统上方继续建造地表工程,此项目还需要谨慎规划。
应用推荐