The contractor will provide development, integration testing, procurement and delivery of the Low Band Universal Communications System Program Transmit Terminal Equipment (TTE).
SAIC公司将为海军提供低波段通用通信系统程序传输终端设备(TTE)的开发、集成测试、采购和交付等服务。
System testing is scheduled to begin in 2010 with program completion in 2012.
预计将从2010年开始进行系统测试,2012年完成测试。
This paper introduces the principle of the Computer Aided Testing system of normal stress in crossbeam wind. It gives the detailed structure of handling program.
本文介绍了横梁弯曲正应力计算机辅助测试系统的工作原理,给出了处理程序的详细结构。
In this paper we discuss the program testing and some related issues in the development of the Geophysical Data Processing system (GRISYS).
结合大型地球物理数据处理软件系统GR ISYS的开发实践,讨论程序测试的若干方法及有关问题。
The paper brought forward simulation tactic of complex numeral system, designed VHDL testing basic program and finished simulation validation of system function blocks.
本文提出了复杂数字系统的模拟策略,设计了VHDL测试基准程序,完成了系统功能模块的模拟验证。
Meanwhile there is a dynamical simulative testing function for working program in the system.
同时系统具备动态模拟检验加工程序的功能。
The paper provides a detailed discussion on the theory of this new propulsion system, on the optimum design and calculation program, its construction, per formance. model testing and practical use.
本文就这先进推进系统的原理、优化设计计算程序以及系统的结构、性能、模型试验和实用化等作了阐述。
The special setting for precise positioning of the X-ray source in industrial Computed Tomography (ICT) system has been made, and the testing program has been developed.
为了实现工业CT系统射线源的精确定位,设计了射束中心位置测试专用装置,并开发了测试程序。
At last, program download and testing are introduced, which is the specific work in the embedded system.
最后本文还介绍了程序的烧写与测试,这一步是嵌入式系统所特有的工作。
Allowing unhandled exceptions in threads to proceed naturally, until the operating system terminates the program, exposes such problems during development and testing.
如果允许线程中的未经处理的异常正常继续,直到操作系统终止程序为止,将会在开发和测试过程中暴露此问题。
Integration testing is the process of verifying that the components of a system work together as described in the program design and system design specifications.
完整性测试验证系统的各组成部分是否按照程序设计和系统设计规格说明协同工作。
The temperature control system of box heat-treatment furnace based on PLC was designed, including hardware system, temperature control program and testing of control program.
设计了以可编程控制器(plc)为核心的箱式热处理炉温度控制系统,包括硬件设计、控制程序设计及调试。
Extensive system integration, product-testing services, end user support, and program management is also available under the CHS-3 contract.
3合同还包括了广泛的系统集成、产品测试服务、端用户支持以及计划管理。
Evaluation module using Dynamic Testing and Black-box Testing as the base evaluation model and then achieve functional testing of user program by the test case library provided in the system.
以动态测试和黑盒测试作为评测功能的底层模型,借助系统的测试用例库实现用户程序的功能测试;
Based on the analysis of ICMP protocol and network's connectivity testing, solutions to test and corresponding application program for the embedded system are proposed.
在对ICMP协议进行分析的基础上,通过网络连通性检测的试验,提出了检测的方法,并设计出相关的程序应用到具体的嵌入式系统中。
In this paper, we have studied the theory and experiment of intelligent wide-band tunable laser around Beijing Natural Science Foundation Proposed Program and developed two testing laser system.
本文围绕着北京市自然科学基金项目,对智能化宽频带可调谐激光器进行了理论和实验两方面的研究,并初步研制出两台实验样机。
Based on academic analysis of the jet configuration, the general plan was designed. Using the numerical simulation program and the explode testing system, an experimental plan was established.
通过对大孔径射孔弹射流特征的理论分析,提出总体设计方案,利用数值模拟和爆轰测试进行优化设计确定实验方案。
Based on academic analysis of the jet configuration, the general plan was designed. Using the numerical simulation program and the explode testing system, an experimental plan was established.
通过对大孔径射孔弹射流特征的理论分析,提出总体设计方案,利用数值模拟和爆轰测试进行优化设计确定实验方案。
应用推荐