Task planning and fidelity evaluation are two fundamental issues in many haptic simulation systems.
交互过程的任务规划和逼真度评价是力反馈模拟系统的两个重要问题。
In conventional automobile assembly process designing, assembly task planning mainly depend on handwork of the process engineers.
传统汽车装配工艺设计中的任务规划主要依靠工艺人员手工完成。
The aim is to develop the model of task planning and the criteria of fidelity evaluation for real-time Chinese calligraphy simulation system.
目标是针对汉字书写模拟建立人的触觉技能表达和逼真度评价模型。
The bore sequence of every working face is random to the multi joint rock drilling manipulator, so the bore task planning is very complicated.
多关节凿岩机械手在工作时,完成的是一个在一定工作面上随机的钻孔孔序任务,其孔序规划相当复杂。
A new task planning of diode chips detection, the corresponding data-structure and the calculation method of correlative parameter are put forward.
提供了一种新的二极管芯片识别检测的任务规划方法,并提供了相应的数据结构,以及参数的计算方式。
Therefore, the feasible way to control the space robot is ground teleoperation, which USES the human intelligence to achieve the high task planning.
因此,切实可行的方法是充分利用人的智能进行高层任务规划,采用地面遥操作空间机器人的方式完成空间作业。
This paper is concerned with a study on the design task planning system of press dies based on requirements of the development platform of the dies CAD system.
依据冲模CAD系统开发平台的设计思想,论述了其关键支撑技术之一的冲模设计任务人机交互式规划系统的研究工作。
According to this structure, constructing MES will be able to realize real-time scheduling of production task planning and real-time control of production process.
按照这种框架所构建的制造执行系统,能够实现生产作业计划的实时调度以及生产过程的实时控制。
Task planning of Agile manufacturing shop floor, which links shop floor planning and scheduling, is to dynamically allocate tasks on the level of manufacturing cells.
敏捷制造车间任务规划作为联系敏捷制造车间计划与敏捷制造车间调度与控制的纽带,是计划任务在敏捷制造单元层上的动态分配。
Taking class arrangement as an example, we have given a new combinatorial algorithm for multi-task planning under given resources and discussed its implementation with LISP programming language.
以学校排课问题为例讨论了在资源有限的条件下确定多任务分配方案的模型,并给出一种基于组合方法的算法和用Lisp语言数据结构的实现方法。
In this method, the virtual fixtures(VF) is used to assist task planning at the operator′s side and the impedance control is used, which is robust against the model errors at the slave robot side.
描述了机器人辅助腹腔介入治疗中的手术规划模型和虚拟夹具(VF)方法,研究了引导型和障碍型两类虚拟夹具的空间运动约束生成方法以及基于导纳控制的综合控制策略。
Smart companies, they believe, will try to bake more task-based planning into their strategies.
他们相信,聪明的公司会尝试将更多基于任务的计划纳入它们的战略中。
But of all the tasks we gave, the key searching task also requires planning and some kind of strategy.
但是,在我们提供的所有任务中,钥匙搜索任务同样需要计划和一些策略。
Agile principles advice not to work out detailed plans at a task level upfront - but it does not discourage planning in any way.
敏捷原则只建议不要预先做细分到任务层面的计划——但它并不是劝阻任何层面的计划。
The quality of a voice application depends entirely on the amount of planning and available resources for the task at hand.
语音应用程序的质量完全取决于对手头的任务的规划及可用的资源数量。
In agile teams this is generally reflected in the use of planning poker and a focus on estimating by feature rather than task.
在敏捷团队中,这通常反映在规划扑克的使用和关注在功能估算而不是任务估算上。
Each of these alternatives to Management By planning involve some form of planning, and some of them even employ very detailed task plans.
这些“以计划管理”的不同替代都有不同形式的计划,而且有些甚至采用很细致的任务计划。
They designed a task force to fully implement a planning process using monthly sales and operations meetings.
他们设立了一个工作小组,召开月度销售与运营会议来全面实施这一规划流程。
Architects might read the entire series but they could focus on chapters 2-4, which cover the portal workshop, project planning and task estimation, and portal design.
架构师可能需要阅读整个系列,不过他们可以把主要精力放在第2 - 4章,其中介绍了门户研讨会、项目计划和任务评估、以及门户设计。
Checklists: When planning any big task, make a checklist so you don't forget the steps while in the busy middle part of doing it.
确认单:当策划大项目的时候,做一个确认清单,这样你就不会由于太忙而忘掉一些步骤。
When the persuading and the planning for the western railroads had been completed, the task remained: the dangerous, sweaty, backbreaking, brawling business of actually building the lines.
当有关西部铁路的说服和规划工作终于完成后,真正艰难的任务还没有开始;即危险,吃力,需要伤筋动骨和吵吵嚷嚷的建造这些铁路的实际工作。
At the conclusion of the conference, roughly 18 different focus groups were formed and charged with the task of planning concrete actions that would address the central concerns of the Summit.
会议结束时,大约形成了18个讨论小组,负责计划那些能解决峰会核心问题的具体行动。
During the first Sprint Planning Meeting, she sat at the back of the room working on email, as the Team completed the task breakdown for a big feature at the top of the Product Backlog.
第一个Sprint规划会议期间,团队为在产品Backlog顶部的一个大型功能进行任务分解时,她坐在会议室后面处理email。
There's a lot of built-in support for agile planning, including help with sprint planning and a task board to support daily scrum meetings.
它有许多敏捷规划的内置支持,包括协助冲刺计划和广泛支持Scrum日常会议的任务。
Using the Planning perspective can make it easier to figure out which task to work on next because this perspective maximizes the area available to the task editor and Task List.
使用Planning透视图可以更容易地发现接下来要处理哪个任务,因为这个透视图会将任务编辑器和Task List的区域最大化。
If you switch to the Planning perspective when no task is active, you're automatically switched into that perspective when you deactivate the next task that you work on.
如果在没有活动任务时切换到Planning透视图,那么当停止要处理的下一个任务时,就会自动切换到那个透视图。
Jim Goughenour, former VP and CTO of Sealy, Inc., adopted an interesting alternative to management by task-level planning.
JimGoughenour,Sealy公司的前副总和首席技术官,采用了一种不同而有趣的任务层面计划管理方法。
Later in the article, we'll introduce a capacity planning tool, the IBM Infrastructure Planner for Cloud Computing, to make the planning task simpler.
在本文的后面,我们将介绍容量规划工具,即IBMInfrastructurePlanner forCloudComputing,以便使规划任务更加简单。
Nevertheless, you can realize huge benefits from this task â “ not only for the organizational planning, but also for the rest of the migration, down to operation and maintenance.
无论如何,可以通过这个任务获得巨大的收益 —— 不仅对于组织规划有好处,对于迁移过程的其余部分直至操作和维护,都很有好处。
Wiley Post knew that any effort has a good chance of success if the person planning the task is well prepared. So he worked hard to prepare well.
威利·波斯特知道,如果准备工作做得好的话,他就有了一个良好的成功机会,所以,他努力做好各项准备工作。
应用推荐