• The construction schedule was plagued by the bad weather.

    天气恶劣使工程进度受阻。

    youdao

  • The construction schedule is only a plan, which always has risk.

    施工进度计划只是一个计划,总存在风险。

    youdao

  • The construction schedule and methods of the latter system were put forward.

    提出了干挂石材墙面采用现浇聚氨酯保温隔热系统的施工程序及方法。

    youdao

  • These meetings should include reviewing and updating the construction schedule and the cost estimates.

    这些会议应当包括回顾和更新施工进度和成本预算。

    youdao

  • Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.

    施工中的其他工作必须围绕着并适应施工进度计划的要求安排。

    youdao

  • These projects were based around and driven by the construction schedule for the buildings, a very sequential process.

    这些项目工作是由建筑物的施工进度驱动的,是一个非常有序的过程。

    youdao

  • This method has the obvious effect to ensure the construction safety, speed up the construction schedule and reduce the construction cost.

    该方法在确保施工安全、加快施工进度、降低施工成本方面具有显著的效果。

    youdao

  • The groundwater inflow into a tunnel affects not only the construction schedule, cost, stability and safety, but also the groundwater level.

    隧道涌水不但影响施工进度、施工费用、稳定和安全,也会引起地下水位的下降。

    youdao

  • Therefore, in the management of modern construction projects, it is becoming an important work to control and manage the construction schedule.

    因此,在现代施工项目管理中,对工程进度的控制和管理成为一项极为重要的工作。

    youdao

  • Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.

    编制工程进度月计划、周计划以控制阶段工期的如期完成。

    youdao

  • The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.

    介绍了P 3软件的功能和特点以及在某抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

    youdao

  • In that case, ensuring the construction term of the construction schedule reasonably and impersonally would be the guarantee of the whole construction procedure.

    如何科学、客观地确定施工进度计划中各分部、分项工程的持续时间是施工进度计划具有合理性和可行性的保证。

    youdao

  • Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.

    模板工序在许多情况下是施工网络图中的关键线路,模板工艺的改进常常可以加快施工进度。

    youdao

  • In the construction of highway, the construction organization of through cut and the construction quality will influence the construction schedule and slope stability.

    在公路建设中,路堑开挖施工组织是否合理、施工质量如何,将影响施工进度和边坡的稳定。

    youdao

  • In the construction process of the old people's home of Nansan, we seek after some methods to control the construction schedule better together with the construction unit.

    结合青岛市福彩南山养老院工程,与施工单位共同对如何做好进度控制工作进行了一些探索。

    youdao

  • Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.

    [摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。

    youdao

  • Excavation scheme is determined accordingly, which can satisfy the requirement of operation of large machines, reduce the construction cost and ensure the construction schedule.

    该方案满足大型机械施工条件,能大大提高效率,且为确保工期,降低工程造价创造了条件。

    youdao

  • The implementation of transitional plan dramatically improves the construction efficiency, shortens the construction schedule and guarantees the quality and safety of construction.

    过渡方案的实施缩短了施工工期,确保了施工质量和安全。

    youdao

  • With careful monitoring, considering the accordance of the construction schedule and the loading speed, the reclaiming process is integrated with the treatment of soft soil in this case.

    该工程的特点是在严密的监测下,吹填进度和加荷速度一并考虑,围海造陆过程与软基处理过程融为一体。

    youdao

  • In light of the construction difficulty during building a long tunnel in soft rock mass, the 3d numerical simulation is used to analyze the construction schedule of the Changliangshan tunnel.

    针对长梁山隧道软弱围岩段的施工难题,采用三维数值模拟手段对施工过程进行了计算分析。

    youdao

  • Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.

    图10:用每个迭代最后的重要的交付日期对整个构建阶段分成三个六周周期的综合时间表进行采样。

    youdao

  • The Augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the White House for consideration.

    奥古斯汀专项研究小组质疑提交给白宫考虑的报告中的成本、设计以及建设计划。

    youdao

  • For example, the master single-tier schedule in Figure 10 has the overall Construction phase divided into three six-week periods.

    例如,图10中单层的综合图表将整个构建阶段分为三个六周的周期。

    youdao

  • Supervise, co-ordinate and schedule the activities of workers who operate cranes and construction, paving, drilling, railway maintenance and other similar heavy equipment.

    监督,协调和统筹安排操作起重机和施工,摊铺,钻井,铁路维护及其他类似的重型设备工人的活动。

    youdao

  • In this paper author introduces the application of this article in road bidding, construction management, engineering schedule, engineering quality, engineering cost and contract management.

    着重论述了本条款在公路投标、施工组织、工程进度、工程质量、工程费用、合同管理各个阶段中的应用。

    youdao

  • Because of rain, construction on the subway system fell behind schedule.

    由于下雨,导致地铁的工程进度落后。

    youdao

  • The construction management plan to be optimized and executed to help the works completing on schedule with good quality and safety.

    优化施工组织设计并组织实施以利工程能在优质、安全的前提下能如期完成。

    youdao

  • We should work according to the overall schedule chart (the construction time schedule) of the project.

    我们应该根据工程项目标总进度表(构筑进度表)工作。

    youdao

  • The construction was completed three weeks ahead of schedule.

    建设工程比原计划提前三个星期竣工。

    youdao

  • The construction was completed three weeks ahead of schedule.

    建设工程比原计划提前三个星期竣工。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定