• Total float for the activity is 9 days.

    该项工作时差9天。

    youdao

  • The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.

    图上直接展示施工进度网络计划时间参数,特别是各工作时差自由时差。

    youdao

  • The total float time is one of the important time parameters for a working task, and also is the basis for ascertaining critical work and critical paths in network planning.

    工作时差工作主要时间参数之一,是网络图关键工作关键线路判别依据

    youdao

  • In the practical engineering processes, the amount of resources is strictly limited, so in the actual engineering, the traditional CPM can not give the correct total float and critical path.

    实际工程工序资源量受到严格限制的,传统CPM不能给出正确工序时差关键路线

    youdao

  • This paper shows the incompatability of system structure of the model of the network diagram, thus realizes the demonstration that algorithm for the total float of A on N and A on A is mistaken.

    本文揭示了传统网络构图模型系统结构不相容性,从而实现了传统网络时差计算错误论证

    youdao

  • If our premiums exceed the total of our expenses and eventual losses, we register an underwriting profit that adds to the investment income that our float produces.

    保费收入超过费用可能赔付损失总额的部分,我们可以将它记录我们利润,同时,浮存金产生的投资收益也会加计到我们的利润中去。

    youdao

  • If our premiums exceed the total of our expenses and eventual losses, we register an underwriting profit that adds to the investment income that our float produces.

    保费收入超过费用可能赔付损失总额的部分,我们可以将它记录我们利润,同时,浮存金产生的投资收益也会加计到我们的利润中去。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定