• In this paper a model for the whole process of soil compacted by dynamic compaction is proposed and the problems of two ultimate void ratios are discussed.

    提出一个强夯中土体被夯实的全过程模型,讨论了两个极限孔隙比问题。

    youdao

  • To ensure stability of the whole structure of steel-lined, grouting is always applied into void treatment in which chemical grouting was supplementary for cement grouting.

    为保证钢衬整体结构的稳定性,通常都对脱空进行接触灌浆,一般以水泥灌浆为主,化学灌浆则用于水泥灌浆后的辅助补强。

    youdao

  • To ensure stability of the whole structure of steel-lined, grouting is always applied into void treatment in which chemical grouting was supplementary for cement grouting.

    为保证钢衬整体结构的稳定性,通常都对脱空进行接触灌浆,一般以水泥灌浆为主,化学灌浆则用于水泥灌浆后的辅助补强。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定