Whatever the cause, the Tehri Dam hasn't come close to delivering the amount of power or water that was expected.
无论原因是什么,特赫里大坝都没有输送预想的那么多的电力和水。
Hoover Dam provided the two key ingredients - water and power - that freed the Southwest and southern California to go on a 75-year growth spurt.
胡佛水坝提供了两种关键的成分,水和电,使加州的西南部和南部实现了75年的井喷式增长。
The International Water Power and Dam Construction Organization has conducted surveys to determine potential sites for construction of small power plants.
国际水力发电及大坝建设组织已经通过调查来决定修建小型发电厂的地点。
The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.
三峡水利枢纽主要由拦河大坝及泄洪建筑物、水电站、通航建筑物组成。
The geology and the topography are complex in dam site area of Jiangkou water power station.
江口水电站坝址区地质地形较为复杂,大小夹层分布众多。
The dam, completed in 1936, is used for flood and silt control, electric power, irrigation, and domestic and industrial water supplies.
水坝完成于1936年,用于防洪和控制淤积,还能发电、灌溉、供给家庭和工业用水。
Songshan concrete face rockfill dam is the head project of Songshan diversion works for Songjianghe water power station.
松山混凝土面板堆石坝是松江河水电站松山引水枢纽头部工程。
Along with the rapid exploitation of water power resource in west of the country, more and more mid or low-head flood gate dam hinges are appearing.
随着我国西部水电资源的快速开发利用,出现了趆来趆多中低水头的闸坝型水利枢纽。
This scenario would also apply to the situation of using irrigation waters from a farm dam to provide power because the water level, and therefore the Gross Head, would vary enormously.
这种情况也适用于使用情况从一个农场水坝提供灌溉用水的权力,因为水位,因此,在总团长,将大相径庭。
The results show that water power in the cracks is important factor which cause cracks extension. Eliminating or reducing water power in cracks will be beneficial to steadiness of dam foundation.
结果表明,裂纹内的水压力是促使裂纹扩展的重要因素,减小或消除坝基的缝水压力将有助于坝基裂纹的稳定。
With the support of the Nazi Gorge water power station which is going to be built, the graduate paper studies the main engineering geology properties of the rock-mass and soil-body in the dam area.
本学位论文以拟建纳子峡水电站为依托工程,研究了坝区岩土体的主要工程地质性质。
A water power station must have a dam.
水电站必须有拦河坝。
The major dam of Hutiao Gorge Water-Power Station is first chop large scale earth and rockfill dam.
虎跳峡水电站大坝工程属一级大型土石坝。
In order to fit relative variable spaces between the power plants, flexible connectors of penstocks are commonly installed for water diversion in a dam-rear power plant.
为适应厂坝间相对变位,坝后式厂房引水压力钢管通常设置伸缩节。
Through finite element method calculation, we analyse the stress and stability of the bank spillway concrete structure in bad conditions for the dam of Yanzhangxi (1) Water Power Station in Longquan.
通过有限元计算,分析龙泉市岩樟溪一级电站拦河坝在最不利工况时对岸坡溢洪道结构的应力和稳定的影响。
Through finite element method calculation, we analyse the stress and stability of the bank spillway concrete structure in bad conditions for the dam of Yanzhangxi (1) Water Power Station in Longquan.
通过有限元计算,分析龙泉市岩樟溪一级电站拦河坝在最不利工况时对岸坡溢洪道结构的应力和稳定的影响。
应用推荐