• This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.

    华能玉环电厂1 000MW机组工程雨水泵房沉井施工作介绍,包括:地质条件结构型式施工准备顺序、方案。

    youdao

  • If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc. must be solved before the construction of the power plant.

    电厂取水口掩护后,取水口、取水渠必须电厂建设之前予以解决。

    youdao

  • If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc. must be solved before the construction of the power plant.

    电厂取水口掩护后,取水口、取水渠必须电厂建设之前予以解决。

    youdao