The effect of wicket opening time for water turbine on the transient process of hydropower station was studied by theoretical analysis and numerical calculation.
针对国内外规范对导叶开启时间的不同规定,结合理论推导和数值计算实例,分析了不同的导叶开启时间对水电站过渡过程的影响。
The effect of wicket opening time for water turbine on the transient process of hydropower station was studied by theoretical analysis and numerical calculation.
针对国内外规范对导叶开启时间的不同规定,结合理论推导和数值计算实例,分析了不同的导叶开启时间对水电站过渡过程的影响。