• The effect of wicket opening time for water turbine on the transient process of hydropower station was studied by theoretical analysis and numerical calculation.

    针对国内外规范开启时间不同规定,结合理论推导数值计算实例分析不同的导开启时间对水电站过渡过程影响

    youdao

  • The effect of wicket opening time for water turbine on the transient process of hydropower station was studied by theoretical analysis and numerical calculation.

    针对国内外规范开启时间不同规定,结合理论推导数值计算实例分析不同的导开启时间对水电站过渡过程影响

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定