Experts estimated the work could lead to the first animal-human transplants within five years.
专家们估计有望在五年内实现第一例动物到人体的器官移植。
Click the clock icon in the right corner of the work item, and change the estimated time to 4 hours (Figure 19).
点击这个工作条目右角上的时钟图标,将估算时间更改为4小时(图19)。
Notice that the current work panel (Figure 40) indicates that the work is "Imprecisely Planned," yet it is estimated in hours and assigned to someone.
注意到目前的工作面板(图40)显示工作是“Imprecisely Planned”,现在它是以小时估计并分配给每个人的。
Next, you will open the My Work view to see the work items assigned to John, and you will modify the estimated time of the work items.
接下来,您将打开MyWork视图,查看分配给John的工作条目,并且您将修改这个工作条目的估算时间。
And the wind farms are bringing much-needed work - an estimated 6, 000 jobs a year in this area.
但风电场正为当地创造了许多工作机会-一年估计有6000多个工作。
Penn Mutual estimated the work a mother with a young child does around the house at about $45, 000 but said those women perceived their worth at just $29, 000.
佩恩公司估计,带着年幼孩子的女性所做的家务价值4.5万美元,但这些女性认为价值仅有2.9万美元。
The estimated time in the work item appears as 4hrs, which we had modified from the My work view.
这个工作条目中的估算时间显示为4小时,这是我们从MyWork视图中修改过的。
February 23, 2011 - An estimated 210 million people are out of work worldwide, the highest level of unemployment ever recorded.
2011年2月23日:—全世界估计有2.10亿失业人口,达到了有记录以来的最高失业水平。
With sea levels expected to keep rising, work to broaden coastal dunes and strengthen sea and river dykes is estimated to continue for another 100 years.
随着海平面持续上升,扩大沿岸沙丘和加强抵御海水、河水的大坝的工作大约要再持续100年。
Let's say the project was estimated based on the labor of senior engineers (i.e., expensive), but the work is actually being performed by more junior-level engineers (i.e., at a lower cost).
让我们假设工程以高级工程师的劳动成本来评估(也就是高成本),但是实际上工作是由更多初级工程师来执行的(也就是低成本)。
Look at the amount of money your project has actually consumed and determine whether your actual spending is more than originally estimated based on the work that has been completed.
看看项目的实际支出总额,根据已完成工作判断自己的实际支出是否超出了原来预估。
Four years ago, the ILO estimated at least eight million children work in these areas.
四年前,国际劳工组织估计,至少有八百万名儿童在这些领域工作。
A recent survey estimated that Britain's economy lost more than? 800 million a year to games played on smartphones such as iPhone at work.
一项最近的调查估计,每年英国超过8亿的经济损失是因为工作时玩智能手机(比如iPhone)游戏。
And the wind farms are bringing much-needed work - an estimated 6,000 jobs a year in this area.
但风电场正为当地创造了许多工作机会-一年估计有6000多个工作。
An estimated 500,000 Kyrgyzstanis work in Russia and 50,000-100,000 in neighbouring Kazakhstan, depending on the season.
估计有50万吉尔吉斯斯坦人在俄罗斯工作;根据季节变化,有5万到10万人在邻国哈萨克斯坦工作。
In one study, for example, when students in a work group each estimated their contribution to the team, the total was 139 percent.
例如,一项研究中,当学生小组每个人估计自己对小组的贡献率时,合计达到139%。
The Electric Power Research Institute, a utility consortium, estimated that it would take as long as 15 years to go from starting a pilot plant to proving the technology will work.
公共事业联盟电力研究机构估计说,从开始建造领航工厂到证明这项技术能过运行,这将花费长达15年的时间。
Even though they have correctly estimated their work load for six weeks, they were not given a full six weeks to complete those tasks. Consequently, some of the Version 2.0 features are "incomplete."
尽管他们正确的评估了他们六周里的工作量,2.0版本的一些特征依然没有完成。
That's why an estimated 60% to 70% of people who bring iPads to work pay for them out of their own pockets.
所以,据估计,那些在公司使用iPad的人中,有60%至70%都是自掏腰包购置。
She estimated that the work would take three months.
她估计这项工作需要三个月。
We estimated that it would take a week to finish the work.
我们估计完成这项工作要花一个星期。
The variation trend of estimated frequency and signal-to-noise reflect the work course off use from different side.
估计频率的变化和信噪比的变化趋势从不同的侧面反映了引信工作的历程。
This is the process necessary for aggregating the estimated costs of individual activities or work packages to establish a cost baseline.
这是汇总各单个活动或工作细目的估算费用和制定费用基准所必需的过程。
The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.
属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用,监视和控制。
Conclusion the sickbed work during the whole year, month, quarter and single department was estimated easily and rapidly by using the modified method of sickbed utilization index.
结论采用病床利用指数转化后的方法可对病床全年、月、季、单科的床位工作进行方便、快捷的评价。
Conclusion the sickbed work during the whole year, month, quarter and single department was estimated easily and rapidly by using the modified method of sickbed utilization index.
结论采用病床利用指数转化后的方法可对病床全年、月、季、单科的床位工作进行方便、快捷的评价。
应用推荐