• However, evaluation methods of wall rock stability in underground cavern groups with high side-wall, large span and intersect caverns are required for actual projects such as Nuo Zhadu.

    实际工程中,特别是对于糯扎渡这种边墙跨度大、相互交错的地下洞室群的围岩稳定性问题,还缺少系统评价方法

    youdao

  • Finally, some useful conclusions for selecting the site of a large-span cavern and for the design and construction of support are given.

    最后给出一些大跨度峒位置选择支护设计施工方法等意义结论

    youdao

  • Finally, some useful conclusions for selecting the site of a large-span cavern and for the design and construction of support are given.

    最后给出一些大跨度峒位置选择支护设计施工方法等意义结论

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定