• In this paper author introduces the application of this article in road bidding, construction management, engineering schedule, engineering quality, engineering cost and contract management.

    着重论述了本条款在公路投标、施工组织、工程进度、工程质量、工程费用、合同管理各个阶段中的应用。

    youdao

  • The construction management plan to be optimized and executed to help the works completing on schedule with good quality and safety.

    优化施工组织设计并组织实施以利工程能在优质、安全的前提下能如期完成。

    youdao

  • The quality control, cost control, schedule control, and safety control are the "four control"in the project construction management.

    质量控制、成本控制、进度控制、安全控制是项目施工管理中的“四大控制”。

    youdao

  • As schedule and cost is managed synthetically in project, earned value concept played an important role in construction project management.

    赢得值原理作为工程项目中进度与成本综合管理,对施工项目管理起着不可忽视的作用。

    youdao

  • This paper probes into the countermeasures for doing well the construction management from aspects of the schedule control, cost control, and quality control, etc.

    从工程的进度控制、成本控制、质量控制方面探讨了搞好施工管理的对策。

    youdao

  • Its thought that psychological health should be improved by means of the teaching schedule, management, the selected courses, social practice and the cultural construction on campus.

    高校大学生健康心理素质的培养,一般认为,应从教育教学规划与管理、课程设置、社会实践与校园文化建设等几方面下功夫。

    youdao

  • In the construction management system, its aims mainly at the cost, schedule and quality of these three aspects.

    在建设项目管理体系中,其目标主要表现在费用、进度和质量这三方面。

    youdao

  • Providing services required because of signIficant changes in the Project, including size, schedule, materials, method of bidding or construction contracting or construction management.

    因工程的重大变化(包括工程规模、进度、材料、招标方法、或施工承包或施工管理等)的要求而提供的相应服务。

    youdao

  • Therefore, in the management of modern construction projects, it is becoming an important work to control and manage the construction schedule.

    因此,在现代施工项目管理中,对工程进度的控制和管理成为一项极为重要的工作。

    youdao

  • A complete construction project management should both include schedule and control. The former is the basis of the latter, and the latter is the security of the former.

    完整的进度管理既应有进度计划,又有进度控制,前者是后者的基础,后者是前者的保障。

    youdao

  • A complete construction project management should both include schedule and control. The former is the basis of the latter, and the latter is the security of the former.

    完整的进度管理既应有进度计划,又有进度控制,前者是后者的基础,后者是前者的保障。

    youdao