• Construction site layout of Hydropower engineering has the complicated logic relation of time and space, coming with the characteristic of dynamic interaction.

    水电工程施工总布置时间、空间逻辑关系复杂,具有动态交互的特性。

    youdao

  • The method of identification construction site layout conflict and the theoretical maneuver of solving this conflict facing to construction procedure are suggested in the thesis.

    提出了面向施工过程的场地布置冲突识别方法以及解决冲突的策略。

    youdao

  • However, judging from the current situation, results of the visualization for construction site layout are not perfect, and the complicacy of the construction site layout leads to it.

    但就现阶段的研究成果看来,有关施工总布置动态可视化系统的研究并不完善。

    youdao

  • SVS is successfully applied to the analysis for the construction site layout for Qizong hydropower station, which validates the rationality and validity of the thought in this thesis.

    并将其运用于其宗水电站施工总布置分析中,验证本文研究思路的合理性和有效性。

    youdao

  • Organize the construction site layout planning, including water supply, power supply, processing site, warehouse and office space and other coordination work, solve all the problems of the site.

    组织施工现场布置规划,包括供水、供电、加工场地、库房和办公休息区域等协调工作,解决工地一切协调问题。

    youdao

  • The drawings illustrate the plan layout used in the current construction stage. The site layout will be updated with changes.

    附图为当前施工阶段平面布置图,现场布置有变动时会加以更新。

    youdao

  • The choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper.

    本文就坝址选择及枢纽工程布置、混凝土面板堆石坝设计、施工和原型观测等方面进行了全面的论述。

    youdao

  • It realized rational general layout in narrow area by making use of abandoned excavated materials and overall construction site allocation in Longtan Hydropower Station.

    龙滩水电站工程通过利用工程弃渣和统一调配使用场地,实现了狭窄坝区的施工总布置。

    youdao

  • Then by effective site layout, traffic organization and stadium construction arrangement, the after use of horticultural exposition are easier.

    接下来通过有效的场地布局、交通组织和场馆建筑安排方便会后利用。

    youdao

  • The networks precision depends on the site terrain, building and construction layout. So we laid some branch lines in the engineering.

    控制网的布设形式取决于现场地形、建筑物以及施工平面布置图。

    youdao

  • The networks precision depends on the site terrain, building and construction layout. So we laid some branch lines in the engineering.

    控制网的布设形式取决于现场地形、建筑物以及施工平面布置图。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定