• Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking.

    关键路径进度,识别和控制,项目故障及后果,关键链法,设计结构矩阵连接关键链。

    youdao

  • Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking (PDF).

    关键路径进度,识别和控制,项目故障及后果,关键链法,设计结构矩阵连接关键链。

    youdao

  • Critical path scheduling was one of the earliest applications of computers in construction, but it took quite a long time for it to gain wide acceptance.

    计划关键路线是计算机在建筑行业中最早的用途之一,不过经过了很长一段时间,这一方法才得以广泛承认。

    youdao

  • According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.

    根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。

    youdao

  • In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.

    该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。

    youdao

  • In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.

    该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定