• Introduction the procedure of the construction of deep water pile foundation of the highway Bridges, Analyze out each from of advantage, weakness and usage term, provide the help for engineering.

    简要介绍深水桥梁基础钢围堰两种施工程序分析各自的优缺点使用条件工程的实施提供参考。

    youdao

  • The tie in segment of the diaphragm wall is connected using pre reinforced concrete pile. The foundation strata of two shield well is also reinforced by deep mixing piles in order to seal water.

    地下连续墙接头采用预制钢筋接头连接水,端头辅以深层搅拌加固地基

    youdao

  • Grid-MC-pile composite support and water stop system is successfully applied in deep foundation excavation of Qingdao Capland Center, which is combined of cement-soil gravity wall and double-row-pile.

    泥土重力式挡墙支护模型与双排桩支护模型结合起来,组成格栅式MC桩组合支护、体系成功应用青岛凯悦中心基坑工程。

    youdao

  • Grid-MC-pile composite support and water stop system is successfully applied in deep foundation excavation of Qingdao Capland Center, which is combined of cement-soil gravity wall and double-row-pile.

    泥土重力式挡墙支护模型与双排桩支护模型结合起来,组成格栅式MC桩组合支护、体系成功应用青岛凯悦中心基坑工程。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定