• The paper concludes that earned value method can be applied in the analysis of the total cost variance in land development and consolidation projects.

    研究结论:挣值法可运用于土地开发整理工程成本偏差分析。

    youdao

  • This thesis introduced Function Point into the measurement of the work performed, and constructed the amendatory earned value method for software project based on Function Point.

    本文提出将功能点方法引入到软件项目实际产出成果的度量,构筑了基于功能点方法的软件项目挣值分析方法。

    youdao

  • It corrects the deviation derived from traditional earned value method when forecasting the duration and cost, and it supplies more analysis information than traditional earned value method.

    该方法能改进传统挣值法在预测工期、成本方面产生的偏差,并且与传统挣值方法相比,增加了更多的原因分析信息。

    youdao

  • Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.

    传统挣值法主要适用于工程量清单合同条件下施工单位项目管理活动。

    youdao

  • Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.

    传统挣值法主要适用于工程量清单合同条件下施工单位项目管理活动。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定