The results show that earned value project management method can make integrated management of logistics cost, and provide a basis for better grasping and controlling the project operating conditions.
研究表明,挣值管理方法能够对项目物流成本进行集成管理,它为管理者更好地掌握和控制项目运行状况提供了决策依据。
The results show that earned value project management method can make integrated management of logistics cost, and provide a basis for better grasping and controlling the project operating conditions.
研究表明,挣值管理方法能够对项目物流成本进行集成管理,它为管理者更好地掌握和控制项目运行状况提供了决策依据。
应用推荐