In view of over estimate budget in engineering cost, the author thinks that design is the key, and quota design is the best way of control engineering cost.
针对工程造价超概算问题,本人认为设计是关键,通过限额设计可以控制工程造价。
There are 3 types of estimates according to the accuracy of estimate: order-of-magnitude estimate, budget estimate and definitive estimate.
按照估算的精确度范围可以将估算分为3大类,量级估算、预算估算和确定性估算。
Through logical estimate, budget, control and communication of expenditure, the thesis strives to draft finance management system suitable to the institution.
通过对费用合理的估算、预算、控制、沟通,力求制定出适合本单位的项目财务管理体系。
Through logical estimate, budget, control and communication of expenditure, the thesis strives to draft finance management system suitable to the institution.
通过对费用合理的估算、预算、控制、沟通,力求制定出适合本单位的项目财务管理体系。