In this paper, nonlinear stress-strain analysis for a high earth-rockfill dam and its foundation cutoff is given.
本文对一痤高土石坝与基础防渗墙进行了非线性有限元分析。
Some significant conclusions are remarked as follows:(1) It is validated further that the reinforced range of high earth-rockfill dam is 4/5 height upwards.
进一步验证高土石坝的抗震加固范围为4/5高度以上的坝坡区域。
To build high earth-rockfill dam on thick moraine cover foundation in high earthquake intensity region will face many new problems such as dynamic stability, dam foundation liquefaction etc.
在高地震烈度区修建深厚覆盖层上的高土石坝面临许多新问题,如大坝的动力稳定、坝基液化问题等。
The analytic study on stability and high slope of tunnel rock mass has been carried out by Xi 'an University of Science and Technology for one-stage development of Daluishu earth-rockfill dam.
西安理工大学对一级开发大柳树高土石坝洞群围岩稳定性、高边坡进行了分析研究。
The analytic study on stability and high slope of tunnel rock mass has been carried out by Xi 'an University of Science and Technology for one-stage development of Daluishu earth-rockfill dam.
西安理工大学对一级开发大柳树高土石坝洞群围岩稳定性、高边坡进行了分析研究。
应用推荐