The problem of resource allocation in this scheme is a non-convex non-linear optimization problem.
该模型中的资源分配问题是一个非凸的非线性优化问题。
This kind of non linear optimization problem with constraint has been solved in a practical project. The results are reasonable.
结合工程实例求解这类有约束非线性优化问题,成果合理。
The non linear optimization problem with constraint has been solved by use of the sequential unconstrained minimization technique (SUMT).
用序列无约束极小化方法(SUMT)求解非线性有约束的优化问题。
The non linear optimization problem with constraint has been solved by use of the sequential unconstrained minimization technique (SUMT).
用序列无约束极小化方法(SUMT)求解非线性有约束的优化问题。
应用推荐