The main electric connection of substation is simplified.
该设计简化了电气主接线;
In order to improve its reliability, the main electric connection mode with double 12-pulse valve groups is adopted.
为此,在一次接线上采用了双12脉动阀组接线,使得一个阀组故障时仍可传送一半功率。
This paper presents a synthetic assessment system for main electric connection, especially for high-voltage main electric connection of 110KV substation.
本论文研究的电气主接线综合评价系统,主要针对高压配电网中110KV变电站高压电气主接线的设计。
On the base of assessment system data, we can calculate and analyze the reliability of all the main electric connection schemes by minimal path set method.
在评价系统数据建立的基础上,利用可靠性计算中的最小路法对各种主接线方式的可靠性进行计算和分析。
On the base of assessment system data, we can calculate and analyze the reliability of all the main electric connection schemes by minimal path set method.
在评价系统数据建立的基础上,利用可靠性计算中的最小路法对各种主接线方式的可靠性进行计算和分析。