During the air pressure test, boosting shall be carried out slowly and step by step.
气体压力试验时,应逐步缓慢增加压力。
Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).
No1压载水舱(No.15分段)气压试验(压头试验)检查。
Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).
No1压载水舱(No.15分段)气压试验(压头试验)检查。
应用推荐