A number of people have been employed to deal with the backlog of work.
已雇来一些人处理积压的工作。
TABLE 3.1 Sample Product backlog.
表3.1产品待办事项列表举例。
Why should the backlog be kept short?
计划安排为何要保持较短的期限?
Each planning level has its own backlog.
每个规划阶段都有自己的计划安排。
What to do with all the rest of the backlog?
那么对剩余部分的积压将会如何处理呢?
A huge backlog of work had built up.
一大堆工作积压了起来。
There is a large backlog of cases to hear.
有大量案件要审讯。
The law will also stop the backlog from growing.
新法也会使积案不再增长。
We have a backlog of reservations from last night.
我们从昨晚起就积压了一大堆预约。
It will take a month to clear the backlog of work.
要花一个月的时间才能清理完积压的工作。
My secretary can not cope with the backlog of paperwork.
我的秘书无力处理积压下来的文书作业。
Once an item is done, it is removed from the product backlog.
一旦某项完成了,就会从产品待办事项列表中移除它。
Grooming the product backlog collaboratively is fun and effective.
大家一起协作来梳理产品待办事项列表是很有意思和有效的。
Here is the current, high-level backlog for the Scrum-in-Schools project.
这里是目前“学校中的Scrum”项目高层次的backlog。
In Figure 4, you can see the release backlog split into three sections.
在图4中,可以看到发行版计划安排被划分为三个部分。
When I took office, there was a serious backlog of opinions and other work.
我走马上任的时候,法律意见和其它工作的积压问题很严重。
There is a backlog of repair and maintenance work to be done in our apartment.
我们的公寓堆积了一些待修理及维修的事项。
The problem has now been fixed, however, we have some withdrawal backlog to deal with.
现在问题已经得到解决,不过我们依然还有积压的提款需要处理。
Create a Sprint Backlog iteration plan (see Figure 1).
创建一个Sprintbacklog迭代计划(见于图1)。
One of the most important artifacts in the scrum method is the Product Backlog.
Scrum方法中最重要工件之一就是ProductBacklog。
Backlog level is an important indicator to show whether economy is in good condition.
订单积压水平是显示经济是否良好的一个重要指标。
Backlog level is an important indicator to show whether economy is in good condition.
订单积压水平是显示经济是否良好的一个重要指标。
应用推荐