• The construction phase of the construction cost control, focus on cost controlling.

    建筑工程施工阶段的造价控制,重点在于成本的控制。

    youdao

  • The project construction cost control passes through the entire engineering construction process.

    工程造价的控制,贯穿于整个工程建设的全过程。

    youdao

  • The construction cost control method based upon critical chain theory is testified by an example.

    通过实例验证了基于关键链的工程造价控制方法。

    youdao

  • In the different stage, the construction cost control work key point and the effect are completely different.

    在不同的阶段,造价控制工作的重点和效果是完全不同的。

    youdao

  • Shallow discussion in the hospital capital construction project the contract management and the construction cost control;

    对工程项目设计阶段的造价控制进行了分析与论述。

    youdao

  • Targeted at these problems, the cost control method in the construction phase is proposed.

    针对于这些问题,本文提出了施工阶段成本控制的方法。

    youdao

  • This article has made some research work in the confirmation of product level, the way of design, cost control and construction management.

    本文就装修住宅的产品定位、产品设计方法、成本控制、施工管理等方面的问题进行了研究和探讨。

    youdao

  • Technology and market are the two supports of the construction cost calculation and control.

    技术与市场是建设成本确定与控制的双支柱。

    youdao

  • The traditional cost control methods in construction as well as their defects are also studied.

    研究了传统的施工项目成本控制方法,分析了它们的不足。

    youdao

  • The quality control, cost control, schedule control, and safety control are the "four control"in the project construction management.

    质量控制、成本控制、进度控制、安全控制是项目施工管理中的“四大控制”。

    youdao

  • The engineering cost control, passes through in the entire process of engineering construction.

    工程造价的控制,贯穿于整个工程建设的全过程。

    youdao

  • How to strengthen the cost control of the construction enterprise is a difficult work.

    如何对施工企业加强成本控制是一大难点。

    youdao

  • The construction company's cost control lies in the cost control of the construction phase.

    施工企业的成本控制关键在于施工阶段的成本控制。

    youdao

  • The management and control of cost for a construction project are a dynamic process.

    工程造价的控制与管理是一个动态的过程。

    youdao

  • This paper discussed the general contracting of construction project cost control.

    本论文对施工总承包项目成本制约进行了讨论。

    youdao

  • Based on these problems, this paper expounds the construction stage of cost control method.

    针对于这些问题,阐述了施工阶段成本控制的方法。

    youdao

  • So the owner must pay attention to this, to control cost in construction stage consciously.

    工程结算支付是承包工程合同管理的核心。

    youdao

  • The cost control methods were presented for various stages of power construction.

    从电源建设的各个阶段分别介绍如何对工程造价进行合理控制。

    youdao

  • For each project, the project manager will be the central point for the management of the construction progress and exercise of cost control precisely.

    项目上,以项目经理为管理中心,全面推进施工管理和成本精打细算工作。

    youdao

  • Cost control of project construction?

    施工项目成本控制?

    youdao

  • Quality control should combine organically with the project cost and construction progress.

    质量控制应与工程成本、施工进度有机结合。

    youdao

  • The design stage is the key part in the control of construction cost, but, there is always short of strength of cost control in design phase.

    项目设计阶段是工程造价控制的关键阶段,但目前我们对设计阶段的造价控制的力度还是不够的。

    youdao

  • In the control of construction cost, EVM is used for supervising the cost truth.

    在工程造价控制中一般都使用挣值管理(evm)来监督成本的真实情况。

    youdao

  • This paper introduces the construction project management, cost management and project cost control strategy.

    本文分别介绍了施工项目管理、成本管理以及项目成本控制策略。

    youdao

  • The cost, schedule and quality are the most important aim of control in the construction project.

    工程建设项目的成本、进度与质量一起并称为建设项目管理的三大控制目标。

    youdao

  • The project cost control run through the whole course of construction, and the design stage is a key link.

    论述了工程项目造价控制贯穿于项目建设的全过程,项目设计阶段则是造价控制的关键环节。

    youdao

  • Abstract: the design stage is the key stage to control construction project cost.

    [摘要]设计阶段是建设工程造价控制的关键阶段。

    youdao

  • Construction contract management is a central part of project management and also an important tool to control project cost.

    施工合同管理是工程项目管理的核心,是控制工程造价的重要手段。

    youdao

  • The key in the control of capital construction project cost lies in the earlier stage;

    工程造价的控制重点应在建设项目的前期阶段;

    youdao

  • But, there is also common ground between them, to control the proposed construction project cost.

    但是,它们之间也存在着共同点,旨在控制拟建工程费用。

    youdao