• Every country must have a national pandemic control plan.

    每个国家必须有国家疾病大流行控制计划。

    youdao

  • All material flow should be keyed to the process flow chart and control plan.

    所有的材料流程都要和过程流程图和控制计划相协调。

    youdao

  • Quality control plan for all products.

    产品的质量计划。

    youdao

  • Formulating and auditing sample part control plan.

    制订与评审样件控制计划。

    youdao

  • C. document the change in the change control plan.

    在变更控制计划内记录变更。

    youdao

  • The process to control plan development is ineffective.

    控制计划开发过程缺乏有效性。

    youdao

  • Controlled characteristics are documented in the control plan.

    受控特性应在控制计划中形成文件。

    youdao

  • A control plan for ongoing production verification is required.

    需要准备用于验证生产过程的控制计划。

    youdao

  • The control plan shall cover three distinct phases as appropriate.

    控制计划应适当覆盖三个不同的阶段。

    youdao

  • All special characteristics shall be included in the control plan.

    所有的特殊特性必须包括在控制计划中。

    youdao

  • Customer approval may be required after review or update of the control plan.

    评审和更新控制计划后可能需要顾客批准。

    youdao

  • A detailed construction plan shall be in conformity with the detailed control plan.

    修建性详细规划应当符合控制性详细规划。

    youdao

  • The organization shall develop a control plan that includes, as a minimum, the following contents.

    组织应开发一个至少包括以下内容的控制计划。

    youdao

  • When required by the customer, the organization shall have a prototype programme and control plan.

    当顾客要求时,组织必须制定样件计划和控制计划。

    youdao

  • Are appropriate potential failure modes, as identified in the PFMEA, addressed through the control plan?

    所有在PFMEA中被识别的失效模式,是否在控制计划中都得到体现?

    youdao

  • Design process flow diagram. Support PFMEA. Support process control plan. Take charge of operation instruction.

    负责工艺流程图编制,参与PFMEA、控制计划编制,负责操作指导书编制。

    youdao

  • The paper presents boiler′s craft procedure, system control plan, hardware composition and software programming.

    本文介绍了锅炉的工艺流程,系统的控制方案,硬件组成和软件编程。

    youdao

  • Draw up the equipment electrical maintenance plan and cost control plan, and take effective control during production.

    提出设备电气大修计划与成本控制计划,在生产过程中实施有效控制;

    youdao

  • Process Control Plan.

    制程管制计划。

    youdao

  • Is the Sample built to the released Control Plan?

    样件是否依据发放的控制计划制造的?

    youdao

  • Return to normal process control methods as described in the control Plan.

    正如控制计划中描述的,回到正常的过程控制方式。

    youdao

  • Control plan, procedure flowchart and part of main procedure are introduced.

    介绍了控制方案和程序流程图及部分主程序。

    youdao

  • The General Office organizes relevant employees to study the revised "Control Plan".

    由办公室组织相关人员学习修订后的《控制计划》。

    youdao

  • The General Office organizes relevant employees to study the revised "Control Plan".

    由办公室组织相关人员学习修订后的《控制计划》。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定