The load characteristics chart of the whole distillation tower was proposed.
提出了一种蒸馏塔全塔负荷性能图。
Today, our task is installation of this distillation tower. Get ready, please.
今天,我们的任务是安装这台蒸馏塔,请准备。
This operation reduces the heat duty requirements of the first distillation tower.
这一行动减少了第一次蒸馏塔热负荷的要求。
This operation reduces the heat duty requirements of the first distillation tower.
这一行动减少了第一次蒸馏塔热负荷的要求。
应用推荐