• The research about the method of network planning is another emphasis of the paper.

    快速路系统线网规划方法的研究是论文的另一个重点。

    youdao

  • The system can update network information, offer accurate and complete data for the transportation operation and management, and prepare for network planning in advance.

    本系统可以根据实际情况及时更新交通网络信息,为区域交通网络运输组织和管理提供准确完备的基础数据,并为网络规划工作做好准备。

    youdao

  • Power network planning is a NP hard problem difficult to be solved.

    电网规划是一个较难解决的NP难问题。

    youdao

  • Next it discusses the intercity rail network planning appraisal method.

    其次对城际轨道交通路网规划的评价方法进行了研究;

    youdao

  • This paper presents a new optimization model for power network planning.

    本文提出了一种电网规划的模糊随机优化模型。

    youdao

  • The network planning and its flow are explained.

    说明了网络规划及其流程;

    youdao

  • All above are the basis of the research on theory of urban bicycle network planning.

    这些分析研究,为自行车交通网络的规划理论的建立奠定了基础。

    youdao

  • The application of fuzzy evaluation of blind information in electric network planning.

    盲信息的模糊评价模型在电网规划中的应用。

    youdao

  • With commercial WCDMA network, network planning and optimization is a long-term problem.

    随着WCDMA网络的商用,网络规划与优化会是一个长期的问题。

    youdao

  • Then the network planning and design principles and the problems that exist are analyzed.

    然后介绍了网络规划与设计的原则和存在的问题。

    youdao

  • Load forecasting and substation planning are the base of power distribution network planning.

    负荷预测和变电站规划是电网规划的基础。

    youdao

  • The software has been applied to the long range multiple-mode network planning of Hunan province.

    该方法和软件对于区域或城市多方式综合交通网规划有普遍适应性。

    youdao

  • The study can provide a scientific and effective tool to the urban distribution network planning.

    本文的研究可为城市电网的规划提供一种科学、有效的工具。

    youdao

  • This paper describes a new method for urban transmission network planning required by environmental protection.

    介绍了环保要求下城市送电网的规划方法。

    youdao

  • Network planning technique is the key technique of network scheduling and planning.

    网络计划技术是项目进度计划的核心技术。

    youdao

  • Network planning technology is an effective method in engineering design and management for construction cnpanies.

    网络计划技术方法是工程施工单位进行施工组织设计和管理的一个有效的方法。

    youdao

  • Network planning technology is an effective method in engineering design and management for construction cnpanies.

    网络计划技术方法是工程施工单位进行施工组织设计和管理的一个有效的方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定