• The project schedule is practical.

    项目时间表是可行的。

    youdao

  • Integration of the WBS in the Project schedule.

    在项目日程中整合wbs。

    youdao

  • To control the project schedule and ensure the quality.

    确保项目进度及质量。

    youdao

  • We shall also make the project schedule report everyday.

    我们也将每天提出项目进度报告。

    youdao

  • We shall also make the project schedule report every day.

    我们也将每天提出项目进度报告。

    youdao

  • Schedule control-controlling changes to the project schedule.

    进度控制——控制项目进度的变更。

    youdao

  • Use the project schedule to justify pursuing one of these options.

    在协商的过程中,你需要基于项目时间表,在多种选择中作出决断。

    youdao

  • The project schedule has been compressed, and the CPI is 1.1.

    项目的进度已经进行了紧缩,当前的CPI为1.1。

    youdao

  • This is unpaid and not reflected in the project schedule to our client.

    这是否付费在给我们客户的项目计划中已反映出来了。

    youdao

  • The project schedule management plays a key role in the success of a project.

    项目进度管理对项目的成功与否起着关键的作用。

    youdao

  • The project schedule, Each resource planning, The new technology application;

    施工进度计划;各项资源计划;新技术应用;

    youdao

  • This is the process necessary for controlling changes to the project schedule.

    这是控制项目进度变更需要的过程。

    youdao

  • They collected and logged in the most expedient method for the project schedule.

    他们以最便利的方法为项目进度收集数据并记录。

    youdao

  • The project schedule can reflect this, and the utilization rate will be higher.

    项目计划能反映这一点,这样人员利用率将较高一些。

    youdao

  • We have to allow for the possibility that we might not finish this project on schedule.

    我们必须考虑到我们可能不能按时完成这个项目的情况。

    youdao

  • The tunnel project has already fallen behind schedule.

    隧道工程已经晚了工期。

    《牛津词典》

  • The first phase of the project was completed two months ahead of schedule.

    第一期工程提前两个月完工。

    《新英汉大辞典》

  • We got the project done on schedule.

    我们按期完成了这个项目。

    youdao

  • Since then, however, analysts have noted that the ARJ21 project has been running behind schedule.

    但分析师指出,此后,ARJ21项目的进展落后于计划。

    youdao

  • Drafting a work breakdown structure (WBS) as the basis for a project schedule.

    草拟以项目计划为基础的工作故障结构(WBS)。

    youdao

  • If it is less than one, the project is behind schedule.

    如果SPI小于一表示项目落后于计划。

    youdao

  • The project team would continue in this manner until they were back on schedule.

    项目团队将以这种方式继续下去,直到他们回到进度上来。

    youdao

  • If the SPI is greater than one, the project is ahead of schedule.

    如果SPI大于一,项目是比计划超前的。

    youdao

  • The project team normally consists of project engineer, design engineer, schedule engineer, and various specialists.

    项目工作组通常包括有项目工程师、设计工程师、计划工程师、以及各类专家。

    youdao

  • She said with confidence that you could never complete the project on schedule.

    你不可能按时完成这个计划,她信心十足地说。

    youdao

  • They have completed that project two days ahead of the schedule.

    他们比预期的时间提前两天完成了计划。

    youdao

  • The project is behind schedule again.

    工程又落后于预定计划了。

    youdao

  • The project is behind schedule again.

    工程又落后于预定计划了。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定