• From test, the relationship of cable free end, anchor pier, foundation deformation and cable creep with load is revealed and rational design force for anchorage cable is proved.

    通过试验,掌握了锚索自由端、锚墩和基础变形以及锚索徐变度与荷载的关系,验证了锚索设计吨位的合理性。

    youdao

  • This paper deals with simplified calculation method of the bearing capacity and internal stresses of pier foundation in mountainous area with differentially weathered rock.

    本文针对山区不均匀风化岩石中的墩基础进行分析,并提出了相应的单桩承载力及桩身内力简化计算方法。

    youdao

  • The mode shape function of the pier was offered to study the dynamic deformation feature of the continuous beam bridge sited on the elastic foundation.

    为了研究弹性基础上连续梁的振动特性,提出了连续梁桥墩的振型函数表达式。

    youdao

  • It is more suitable to calculate the foundation settlement with solid pier foundation method.

    地基沉降量计算采用实体墩基法较为合适。

    youdao

  • In addition, the dynamic response of a pier with rigid foundation or pier with elastic foundation is also analyzed.

    此外还分析了刚性基础墩身和弹性基础墩身的动力响应问题。

    youdao

  • By analysing the bearing condition of pier cap and foundation beam (tie beam), this article gives the design approach of pier cap and foundation beam (tie beam).

    通过分析墩帽及基础梁(拉梁)的受力状态,提出了墩帽及基础梁(拉梁)的设计方法。

    youdao

  • According to analysis on the destruction process, treatment advice was put forward on bend buttress pier foundation for laying pipe in soft soil subgrade.

    对破坏的过程进行分析后,提出了软土地基敷管弯管支墩基础的处理建议。

    youdao

  • In this paper, a mathematical model for integral optimization design of pier shaft and its foundation is given, and the SLP method and duality theory are applied here to have a optimal solution.

    本文给出了重力式桥墩与明挖基础整体优化设计的数学模型,选择序列线性规划法,并利用线性规划的对偶理论求最优解。

    youdao

  • The deformation effect of foundation is considered, and the stability of continuous rigid bridge pier is analyzed by means of energy method.

    考虑地基弹性变形影响,用能量法对桥墩的稳定性作了详细的分析。

    youdao

  • It is a key to erect the operation platform for the construction of the pier foundation and the anti-collision facilities in the water.

    在水中进行墩基础和防撞设施施工,搭设操作平台是关键,在风大浪急的外海,施工难度更大。

    youdao

  • The structure is based on the cast-in-place pile pier, and three of the piers and pile foundation were calculated and checked.

    下部结构采用以钻孔灌注桩为基础的三墩柱,并分别对桥墩和桩基础进行了计算和验算。

    youdao

  • In this paper, the bridge 's pier column and pile foundation perform reinforcement design and checking.

    本文针对某桩柱式桥梁,对其墩柱和桩基进行配筋设计和强度验算。

    youdao

  • The procedure of construction with earth-bag cofferdam is introduced for the open-cut foundation in deep water and sandy soil with a narrow space at Pier No.

    介绍了目前在日本应用的一种新的结构形式,即采用加筋材料包裹土体———“土袋”加固软土地基的方法,并从试验和理论两个方面介绍了土袋的加固机理。

    youdao

  • The procedure of construction with earth-bag cofferdam is introduced for the open-cut foundation in deep water and sandy soil with a narrow space at Pier No.

    介绍了目前在日本应用的一种新的结构形式,即采用加筋材料包裹土体———“土袋”加固软土地基的方法,并从试验和理论两个方面介绍了土袋的加固机理。